Reconstruction of the power supply system of the Tyachiv MKZ "SPORTS ARENA" building at the address Tyachiv, Vajdy St., 15 by installing a rooftop solar power plant with a capacity of 119.5 kW


Sector
Energy Sector
Stream
Construction of new generating capacities
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The project involves the modernization of the power supply of the MKZ "Sportivna Arena" building in Tyachiv by installing a rooftop solar power plant with a capacity of 119.5 kW to cover the institution's own needs. The work includes the installation of photovoltaic panels on the roof, inverter equipment, electrical panels and protective automation, laying cable lines, installing grounding and surge protection systems with connection to the facility's internal networks. The expected result is a sustainable and economical power supply for the sports arena, reducing electricity costs, increasing the energy independence and reliability of the facility's operation, as well as reducing CO₂ emissions by replacing part of the electricity consumption with "green" generation. The estimated annual output of the solar power plant will be about 140.7 thousand kWh.

The purpose of the project

Main goal:

Increasing compliance with modern standards

Secondary goal:

Creation of new facilities and services, Поява нових виробничих потужностей

Description of the purpose of the project and ways to achieve it

The main goal is to ensure a stable, economical and environmentally friendly energy supply to the “Sports Arena Tyachiv” by implementing renewable energy. The project is aimed at reducing electricity costs, increasing energy independence and sustainability of the facility’s operation (especially in conditions of risks of power outages), as well as reducing greenhouse gas emissions by replacing part of the consumption with “green” generation. Specific goals (what exactly we want to achieve) Reduce electricity consumption from the network through our own generation (self-consumption). Reduce the facility’s operating costs for electricity and direct savings to the development of sports and infrastructure maintenance. Increase the reliability of the building’s critical systems’ energy supply (lighting, ventilation/heating if available, equipment, security). Ensure a modern energy-efficient standard for utility facilities and create an exemplary example for the community. Achieve a measurable environmental impact through the reduction of CO₂ emissions through the generation of clean electricity. Ways to achieve the goal (how the project is implemented) The project is implemented through the reconstruction of the building's power supply system with the installation of a rooftop solar power plant with a capacity of 119.5 kW to cover the facility's own needs.

Problems and solutions resulting from project implementation

Additional electricity generation.

Socio-economic context

Indicator

Value

Number of people who will use the service

2145 human

Strategic Case

Strategic feasibility of the project

Sector

Energy Sector

Subsector

Renewable energy and alternative fuels

Stream

Construction of new generating capacities

Strategic document

Стратегія розвитку територіальної громади

Task

3.3.3 https://tyachiv-city.gov.ua/strategiya-integrovanogo-rozvitku-gromadi-08-09-21-06-06-2017/

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Transition to a circular economy
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Economic analysis.docx
09.02.2026
12:53:59 UTC

Alternative technical solutions

Technical Solution 1

Reconstruction of the power supply system of the Tyachiv MKZ "SPORTS ARENA" building at the address Tyachiv, Vajdy St., 15 by installing a rooftop solar power plant with a capacity of 119.5 kW

Technical Solution 2

"Construction of solar carports on the territory of the MKZ "Sportivna Arena Tyachiv" with connection to internal networks (approximately 120 kW)"

Total costs2'841'159 UAH4'515'268 UAH
  • For preparation
  • 53'880 UAH89'620 UAH
  • For implementation
  • 2'672'406 UAH4'325'000 UAH
  • For operation
  • 89'873 UAH75'648 UAH
  • For closing
  • 25'000 UAH25'000 UAH
    Average annual costs150'000 UAH150'000 UAH
    Project duration, incl.6 months8 months
  • Deadline for developing a FFS
  • 3 months3 months
  • Implementation period
  • 3 months5 months
    Service life240 months240 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    1
    To components
    0

    Commercial Justification

    Supplier and contractor market assessment

    Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Is the project of interest to small and medium-sized enterprises?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Will the project involve national or international suppliers and contractors?
    Yes, both national and international

    [Response was provided in the Preliminary Investment Feasibility Study]

    Has an analysis of available procurement options been conducted for the technical solution?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Financial justification

    Total project budget

    Total preliminary budget2'841'159 UAH4'515'268 UAH
    Capital costs2'841'159 UAH4'515'268 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation53'880 UAH89'620 UAH
    For implementation2'672'406 UAH4'325'000 UAH
    For operation89'873 UAH75'648 UAH
    For closing25'000 UAH25'000 UAH
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Preliminary Investment Feasibility Study]
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Investment Feasibility Study]

    Average project cost per service recipient

    Service UnitНа одного учасника змагань за рік
    Service Unit Cost248 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Availability of services

    Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
    Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH

    Public-private partnership

    Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
    The project does not fall under the PPP format by its nature/character

    [Response was provided in the Preliminary Investment Feasibility Study]

    Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Results of the feasibility analysis
    Project Preparation Program Engagement and Funding Needs

    Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

    None of the options are applicable

    Project Approval History

    DateDecision NumberPortfolioProject StatusDecisionReasons
    12/02/2026SP-L-120226-20105A55Community SPInvestment Feasibility StudyIncludeMeets the criteria
    26/02/2026SPP-L-260226-8B5A7F53Community SPPInvestment Feasibility StudyInclude-