Reconstruction of boiler room No. 1 of the KP "Smilakomunteploenergo" in the city of Smila, Cherkasy region, by installing (connecting) a cogeneration unit.
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
- Summary
General information
Description of the project
The project plans to reconstruct the existing gas boiler house by installing (connecting) a cogeneration plant on its territory to generate electricity and heat. It is planned to connect the CHP to the gas, electricity and heat supply networks. The CHP's electrical capacity is 530 kW. Currently, the boiler house is completely dependent on external electrical networks. In conditions of a systemic power shortage in the Ukrainian power system and frequent emergency outages, the boiler house loses its ability to perform its main function - production and transportation of thermal energy. Sudden shutdowns of boiler equipment due to a lack of electricity lead to the cessation of coolant circulation, which in the winter period at sub-zero temperatures creates a risk of freezing and destruction of heating networks, heating systems in apartment buildings and social facilities. The use of backup power sources (generators) is a short-term solution that helps to temporarily maintain the system. At the same time, for long-term/continuous operation of the boiler room, the use of backup power sources (generators) is not relevant, as it requires constant fuel consumption and creates an excessive financial burden on the enterprise.
The purpose of the project
Main Goal:
Improving the quality of services
Secondary Goal:
Capacity building, Improving the equality of wealth distribution, Introducing innovations and energy-efficient solutions
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of people who will use the service
777 human
Other social
24 units
Strategic Case
Strategic feasibility of the project
Sector
Municipal infrastructure and services
Subsector
District Heating
Stream
Reconstruction and modernization of community heating systems with the introduction of energy-efficient technologies and cogeneration units
Strategic document
Стратегія розвитку територіальної громади
Task
B.1.4. Increasing the energy efficiency of heating systems
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Alternative technical solutions
Technical Solution 1
Reconstruction of boiler room No. 1 of the KP "Smilakomunteploenergo" in the city of Smila, Cherkasy region, by installing (connecting) a cogeneration unit with a capacity of 530 kW.
Technical Solution 2
Reconstruction of boiler room No. 1 of the KP "Smilakomunteploenergo" in the city of Smila, Cherkasy region, by installing a solar power plant
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Financial justification
Total project budget
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]