General information
Description of the project
The control and automation system is distributed and multi-level. The control of the parameters provided is performed both locally - by direct-acting devices, and using converters and secondary devices installed on the KVP and A panels. The control of the actuators is possible both manually locally and remotely, or automatically from the Shcha and Shcha boards. The automation systems are based on microprocessor technology, the basis of which is a programmable logic controller (PLC). The project provides for the use of the PLC LOGICONT-S200 manufactured by OOO "IX-Techno". The PLC LOGICONT-S200 has a modular design, the ability to use local and distributed input-output structures, wide communication capabilities, a variety of functions supported at the operating system level, high ease of operation and maintenance. This ensures optimal solutions for building automatic control systems for technological processes.
The automation system provides input, output, and primary processing of analog and discrete signals according to programmed algorithms.
All signals about the parameters and status of the equipment are output to the controller, from where they are transmitted to the active HMI panel (located on the control panel) to allow the operator
to visualize data about the status of the equipment and control it. An automated workplace (AWP) is also connected to the controller to monitor the technological parameters of the furnace.
Automatic regulation, blocking protection, and signaling are implemented at the controller level and operate independently of the upper levels.
The purpose of the project
Main Goal:
Increasing compliance with modern standards
Secondary Goal:
Capacity building, Improving the quality of services
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of people who will use the service
10 thous. people
Strategic Case
Strategic feasibility of the project
Sector
Municipal infrastructure and services
Subsector
District Heating
Stream
Restoration, modernization and development of the centralized and decentralized heat supply system
Strategic document
Регіональна стратегія розвитку
Task
3.2.3. Improving the living conditions of the population
Project objectives
Project Sustainable Development Goals
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Alternative technical solutions
Technical Solution 1
Automated control system based on the use of microprocessor technology
Technical Solution 2
Manually heating the KVGM-50-150M boiler
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Financial justification
Total project budget
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]