General information
Description of the project
At the end of the 20th and beginning of the 21st centuries, energy conservation and environmental improvement became priorities in global energy practice. The main directions for solving these urgent problems are improving the environmental friendliness of boiler plants and increasing the efficiency of fuel use in them.
The purpose of the reconstruction is to restore and increase the operational capacity of the facility by replacing worn-out equipment, installing high-efficiency water-heating boilers, modernizing auxiliary systems, and improving the overall thermal efficiency and reliability of heat supply. The project also includes the modernization of buildings, restoration of structures, integration of modern automation and dispatching systems, and adaptation to safety requirements and environmental standards. The proposed investment is particularly relevant in the context of infrastructure restoration.
Therefore, the Project aims not only to increase energy efficiency and reduce fuel consumption, but also to strengthen the resilience of critical infrastructure in support of urban stability and social protection.
Main reconstruction measures:
- replacement of boilers with modern high-efficiency water heating models;
- replacement of auxiliary equipment and materials, in particular pumping equipment, chemical water treatment systems, electrical equipment, lighting, etc.;
- replacement of chimneys;
- replacement of entrance doors and window openings;
- repair of the roof;
- updating the exterior finish of the boiler house building;
- reconstruction of the external power supply system with connection to the existing transformer substation substations.
This project is a duplicate in the DREAM system for the project DREAM-UA-010725-9BAE6118 "Reconstruction of the boiler house in the Saltivskyi district of Kharkiv".
The purpose of the project
Main Goal:
Increasing compliance with modern standards
Secondary Goal:
Capacity building, Rebuilding the damaged/destroyed, Improving the equality of wealth distribution, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Improving the quality of services
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of employees of the institution/institution/organization
16 human
Number of people who will use the service
7239 human
Strategic Case
Strategic feasibility of the project
Sector
Municipal infrastructure and services
Subsector
District Heating
Stream
Reconstruction, major repairs, new construction, restoration, development, modernization (including supply of equipment and materials) of facilities and networks for the supply of thermal energy and hot water in the city of Kharkiv
Strategic document
Регіональна стратегія розвитку
Task
11 Modernization, adaptability and decarbonization of district heating systems.
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Have the greenhouse gas emissions or emission reductions (Scope 1-2) associated with the project been calculated for a typical year and the entire project period?
Does the project require an environmental impact assessment (EIA) in accordance with the Law of Ukraine "On Environmental Impact Assessment"?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Were consultations held with representatives of target groups to take into account gender equality issues in the project?
Have the gender risks and social impacts of the project been assessed?
Are there management and institutional mechanisms in place to ensure gender equality?
Alternative technical solutions
Technical Solution 1
Reconstruction of the boiler house in the Saltivskyi district of Kharkiv
Technical Solution 2
Installation of block-modular boiler houses in the Saltivskyi district of Kharkiv
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Financial justification
Total project budget
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]