Restoration of Pavilion No. 1 of the National Complex "Expocenter of Ukraine"


The purpose of the project:

Other

Key spending unit
State administration of affairs
Functional classification of expenditures and budget crediting
0829 - Інші заходи і заклади в галузі культури та мистецтва, творчі спілки
Target priority of the government
030500 - Розвиток спроможності державних та комунальних установ і закладів соціального захисту населення та надання соціальних послуг
Score
3.1725

Basic data

Detailed description of the project

During the preliminary technical inspection of pavilion No. 1 (a monument of cultural heritage of national significance with protection number 260109/2 in accordance with the resolution of the CMU of November 10, 2021 No. 1180), it was established that the building needs urgent complex repair and restoration works with the translation of outdated engineering networks, replacement of emergency internal and external structural elements, etc., which today are a threat to the preservation of the monument itself. The building has construction structures with damage and defects that indicate a decrease in their load-bearing capacity, non-compliance with the requirements of reliability and safe operation has been established. Frequent emergency situations caused by wear and tear of water supply/sewerage, heat networks and corresponding equipment have negatively affected the architectural condition  object. Wetting of structures with water led to partial destruction of coatings and external  layers of structures, cracks in columns, collapse of external decorative elements, destruction of interior decoration, destruction of roll, glass and galvanized coating, led to warping of doors and the formation of significant cracks in windows.

 These defects and damages, in addition to the negative visual perception of the object, had a bad effect on the state of electrical networks and electrical equipment.

 Threat of collapse of building structures and dangerous operation of engineering networks and equipment  gave an impetus to the search  solving a serious problem.  

  The implementation of the Project involves the full restoration of engineering networks and equipment,  building structures of pavilion #1:

1) Restoration of electrical networks and equipment:

-dismantling worn-out equipment and electrical networks;

-repair work and installation of new equipment;

- commissioning works.

The planned volume of repair and installation works of the electrical management of the building includes a complete replacement of networks/equipment due to their wear and tear and unsafe operation, namely:

- replacement of internal cable networks 0.4 kV – 13,015 linear meters;

-replacement of input-distribution device – 1 pc. ;

-replacement of main technical shields – 2 pcs. ;

-replacement of technical shields  - 50 pcs.;

-replacement of lighting shields  – 17 pcs.;

-replacement of power shields – 2 pcs.;

-replacement of internal light and technical equipment in exhibition halls, offices, stairwells, public toilets, etc.;

-replacement of external architectural lighting;

-replacement of the signal-warning lighting on the spire.

2) Restoration of water supply and sewage networks, equipment:

-dismantling of   old metal water supply and cast iron sewage networks, plumbing equipment;

-repair works and installation of new equipment;

- commissioning works.

 The planned volume of repair and installation works of the water supply and sewage system of the building also includes the complete replacement of networks/equipment due to their wear and dangerous operation . In addition, frequent emergency situations lead to the destruction of decorative elements of the building and the loss of its authenticity.

The list of planned works includes:

-replacement of cold water supply metal pipes with plastic ones (with shut-off and regulating fittings) – 600 square meters;

-replacement of cast iron sewers  pipes on plastic  - 180 square meters;

-replacement of toilets in a public restroom – 10 pcs.;

-replacement in official toilets – 1 pc.;

-replacement of urinals in a public restroom – 2 pcs.;

-replacement of washbasins in restrooms – 8 pcs.;

-installation of a fire extinguishing system pumping station with a control cabinet – 1 pc.;

-complex replacement of the storm (rain) sewage system with the installation of an ice-melting system – 1 pc.

3) Restoration of the heat supply system:

-dismantling of old cast iron equipment and pipes;

-repair works and installation of new equipment;

- commissioning works.

The planned volume of restoration works of the heat supply system involves the complete replacement of existing networks/equipment.

This list includes:

-replacement of heating radiators (with connection fittings) :

  • in the offices  2 floors– 12 pcs. ;
  • in public toilets – 9 pcs.;
  • on stairwells – 20 pcs.

- in exhibition halls  it is planned to install fan coils in the amount of 16 pcs. ;

- replacement of the heat metering unit with a distribution comb  - 1 pc. ;

- replacement of pipes of the heating system with polypropylene - 600 units. meters.

4) Restoration of building structures involves:

-Repair of the roof:

  • replacing the glass part – 1,750 sq.m. ;
  • replacement of a roll roof – 2,000 sq.m. ;
  • repair of a galvanized roof – 100 square meters

- Repair of the basement : 

  •   wall sealing – 18 square meters;
  • concrete floor repair – 25 square meters

 - Repair work in a public toilet after repairs to electrical and water supply networks/equipment:

  • wall tiling – 600 square meters;
  • floor tiling – 150 square meters

 - Repair of external facades of the building – 8,200 square meters;

 - Plastering, decoration of walls, ceilings – 850 square meters;

 - Painting of internal surfaces – 4,250 square meters;

  • Replacing the exit door to the rotunda – 1 pc.

It is planned to carry out   the entire complex of restoration works of pavilion #1 over the course of eight months in 2025 – from May to December. Production of design and estimate documentation for the restoration of the declared volumes is expected  for March-April - UAH 394,000. (with VAT), while author's and technical supervision of the restoration work process is planned for May-December - 405,000 hryvnias (with VAT).

Problems

Current status, description of problems and needs for their solution
The central square of the Expo Center is the only architectural and palace complex in Ukraine and Europe, where all traditional architectural orders are represented. All the main pavilions-palaces are recognized as architectural monuments, and the main pavilion (pavilion #1) among them is the dominant structure and decoration of the entire majestic complex. Its height reaches 75 meters and it is considered the most monumental civil structure of the rotunda type in Ukraine. It is known that an important element of the corporate style of any company is its logo. The logo helps to make the first impression about the company, and the popularity of the brand depends on how concise, bright, and recognizable it is. It is not surprising that the projection of the construction of pavilion No. 1 became the logo of the National Complex "Expocenter of Ukraine". The operation of this building for more than 60 years without major repairs had a negative effect on its general condition. This applies to the worn-out state of engineering networks, the appearance and internal arrangement of the building. Preservation of its original appearance, and in some moments the complete restoration of individual components, requires significant capital investments. Considering the fact that the operating profits of NC "Expocenter of Ukraine" do not cover the urgent need for funds for the preservation of architectural monuments from destruction, which are kept on the balance sheet of the institution, the attraction of state funds is considered as the only available source for financing restoration works. Any loss of cultural heritage is inevitably reflected on current and future generations, leading to spiritual begging, falsification of history, loss of historical memory and, as a result, destruction of the intellectual and creative potential of society. They cannot be compensated by the creation of new significant works, architectural forms, etc. In Ukraine, its cultural and historical memory is inextricably linked with immovable heritage objects that carry the nation's ethnic codes, embody its identity, ideals and heritage. It is no accident that cultural, intellectual and historical values of society are objects of national security (Law of Ukraine "On the Basics of National Security of Ukraine"). The authority of Ukraine as a state in the world largely depends on how careful the country's attitude to its historical and cultural heritage will be. Preservation and development of cultural heritage is one of the conditions for real European integration of Ukraine. This investment project is being developed precisely for the purpose of preserving the monument of cultural heritage of national importance, which is the pearl of a whole complex of magnificent buildings located in the central part of the NC "Expocenter of Ukraine". The priority task of the Project implementation is, of course, the preservation of the monument from decay and destruction. Pavilion No. 1 is the main pavilion (as defined by the State Register of Immovable Monuments of Ukraine) and bringing it to the proper level of operation, first of all, would make it possible to prevent negative factors that cause its destruction and degradation, to ensure conditions for its safe maintenance and visiting citizens Thanks to its location and appearance, Pavilion No. 1 is a landmark object for the organization of entertainment, cultural and educational, spectacular and other events. Since mass events can be held only in places adapted for this, without creating a threat to the livelihood, health or safety of citizens, the balance holder is obliged to ensure the necessary requirements for this (Law of Ukraine "On the Protection of Cultural Heritage"). The implementation of the Project is aimed at achieving the humanitarian goal of popularizing cultural heritage, involving broad segments of the population in cultural achievements, deepening knowledge of the history of our people and the state, etc. If the Project is implemented, it will be possible to preserve the monument of cultural heritage and, as a result, attract a larger number of customers for holding exhibition events, conferences, improve the conditions of service provision and, as a result, increase the scale of dissemination of social and cultural ideas. The consequence of not implementing this Project will be the further destruction and decline of the building, which will cause a decrease in the popularity of the institution as a whole, will decrease the level of interest of the potential customer in events presenting national and international cultures and ideas, and will negatively affect the reputation of our state.
A detailed description of the project goal and the way to achieve it
The purpose of the public investment project is to preserve a separate monument of cultural heritage of national importance under security number 260109/2 in accordance with the resolution of the CMU dated November 10, 2021. No. 1180. The right of state ownership and the right of operational management of NC "Expocenter of Ukraine" to pavilion No. 1 is registered in the State Register of Real Property Rights (registration number 1143782980000). Pavilion No. 1 is located in the central part of the National Exhibition Center "Expocenter of Ukraine" on Akademik Glushkov Avenue, 1 Holosiivskyi District, Kyiv. This Project envisages a complex of measures for restoration work, because since the facility was put into operation (1958), capital repairs of this building and its engineering communications have not been carried out. The complex of restoration works will provide an opportunity to: - preserve the structural qualities of this pavilion and its authenticity; - to ensure reliability and safety during construction operation; - to optimize the use of maintenance funds.

Coordination of the project with strategic documents

Another regulatory document
According to Article 54 of the Constitution of Ukraine, the preservation of historical monuments and other objects of cultural value is one of the main responsibilities of the state.
National Strategy for Regional Development of Ukraine
STATE STRATEGY OF REGIONAL DEVELOPMENT FOR 2021-2027 ADOPTED ON 13.08.2024 Operative Goal 2 "Satisfying the needs of the population in high-quality administrative and public services" provides: Article 34 - Implementation of measures for the protection and preservation of cultural heritage", Article 27 - Creation of functional and organizationally new models of cultural institutions (centers of cultural services, centers of creativity, creative hubs) to ensure the activities of artists, theater and performance cultural institutions, independent theaters, musical and artistic collectives, ensembles, Art. 29 - Formation of an optimal and inclusive network of cultural institutions and of public libraries that will satisfy the needs of various population groups, Article 31 - Implementation of state policy at the regional and local level in the sphere of the establishment of Ukrainian national and civic identity, creation of conditions for national-patriotic, military-patriotic education and civic education of the population at the level of regions, territorial communities, in particular with the involvement of war veterans in the development and implementation of relevant programs, the formation of coordination councils on the establishment of Ukrainian national and civic identity, Article 6 - Creation of various opportunities for the personal and professional development of a person throughout life, Article 11 - Promotion of the development of extracurricular education in accordance with the free, versatile development of personality, intellectual and creative abilities, physical qualities of pupils, students and listeners and the principle of gender equality
Sphere development strategies
According to the Law of Ukraine "On Culture", the main principles of state policy in the field of culture are: - recognition of culture as one of the main factors of the identity of the Ukrainian people; - protection and preservation of cultural heritage as the basis of national culture; - creation of conditions for the creative development of the personality, raising the cultural level, meeting the cultural needs of the Ukrainian people; -preservation, reproduction and protection of the historical environment; - aesthetic education of citizens, first of all, children and youth.

Involved organizations

Organization
NATIONAL COMPLEX "EXPOCENTER OF UKRAINE"
Roles
  • Project author
  • A balance holder
  • An executor
  • An initiator
EDRPOU code
21710384
Organization
State administration of affairs
Roles
  • Key Spending Unit
EDRPOU code
030

Demand for the service and its dynamics

Category
Year
Rating
Measure
Annual demand for services/infrastructure
2021
5513
thous. people
Annual demand for services/infrastructure
2019
4439
thous. people
Annual demand for services/infrastructure
2016
1165
thous. people
Annual demand for services/infrastructure
2022
2577
thous. people
Annual demand for services/infrastructure
2018
2889
thous. people
Annual demand for services/infrastructure
2020
3744
thous. people
Annual demand for services/infrastructure
2023
4128
thous. people
Annual demand for services/infrastructure
2017
1426
thous. people

Project indicators

Indicator
Base value
Target value
Number of people to use the service
5351
5994

Risk assessment

Risk
Category
Degree
Probability
Strategy
Lack of urgency of interest in the implementation of this project
Market risk
Considerable
Medium
Acceptance
The negative impact of exchange rate differences on planned expenditure volumes
Economical risk
Considerable
Medium
Acceptance
Continuation of military operations
Political risk
Critical
Medium
Acceptance
Low demand
Operational risk
Considerable
Medium
Acceptance

Project plan

Budgeting
Implementation
Preparation
Financing
Technical design
244 days
244 days
60 days
58 days
6 days

Gallery

DREAM Code

DREAM-UA-130824-4A6BD525

Status

Active

Create date

13.08.2024

Estimated budget

20'174'000

Project creator

NATIONAL COMPLEX "EXPOCENTER OF UKRAINE"

Initiator

NATIONAL COMPLEX "EXPOCENTER OF UKRAINE"

Implementer

NATIONAL COMPLEX "EXPOCENTER OF UKRAINE"

Project implementation period

01.25 - 12.25

Geography

Kyiv

Classification of sectors of economic activity according to the taxonomy of the World Bank

YZ - Other Industry, Trade and Services