State Single Project Pipeline

Within the Public Investment Management (PIM) reform being implemented by the Government of Ukraine, a unified approach to managing public investments is being introduced at the national, regional, and local levels. In particular, a legislative framework regulating PIM matters has been approved.

The procedure for forming the Single Project Pipeline (SPP) of public investments at the state, regional, and community levels is regulated by Cabinet of Ministers Resolution No. 527 of February 28, 2025. According to the procedure, the SPP contains a list of priority projects and programs from sectoral pipelines that have undergone expert appraisal and have been approved by the Strategic or Local Investment Council as eligible for the corresponding budget financing.

The formation of the SPP at state, regional and community levels through the DREAM ecosystem ensuring transparency and enabling review, analysis, and monitoring by sectoral ministries, international partners, IFIs, and the public. This enhances opportunities for attracting funding.

Information regarding projects and programs is displayed on the State Single Project Pipeline, in accordance with the decisions of the Strategic Investment Council, which are official and subject to mandatory use. At the same time, the public API of the system may temporarily display information that differs in certain particulars from the information published on the portal; such discrepancies are of a purely technical nature and shall be remedied in the prescribed manner.

Reform
CMU Resolution No. 527

All sectors
All streams
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches

Current set filters (Filtered result: 0)

Project code: 021025-2CABADE9
Initiation date
Budget
Status
State level of SPP
State level of SP
Date10. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Installation of a gas-fired power plant up to 20 MW (Supporting critical distributed generation Stage IV: capacity expansion in Lviv region)

Project goal
Capacity building. Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Creation of new facilities and services, Developing new territories or functions, Improving the equality of wealth distribution, Increasing the even distribution of resources, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Creation of new jobs through project implementation, Поява нових виробничих потужностей, Improving the quality of services, Reducing territorial or social gaps, Meeting demand
Geography
Lvivska region
Initiator
JOINT STOCK COMPANY "UKRNAFTA"
Installation of a gas-fired power plant up to 20 MW (Supporting critical distributed generation)
Construction of a 41.5 MW solar power plant
The project involves the construction of a modern gas-fired power plant with an installed capacity of up to 20 MW on the territory of the production facilities of the utility in the Lviv region. The plant will operate on natural gas and annually produce about 81.8 GWh of electricity, which will be supplied to the day-ahead market (DAB) in peak load mode, as well as to provide auxiliary services to NPP Ukrenergo. The installation of gas-fired power plants will increase the flexibility and stability of the Unified Energy System of Ukraine, reduce dependence on unstable electricity supplies and ensure effective integration of renewable energy sources. Due to their technical characteristics, the gas-fired power plants are able to start and stop quickly, operate in variable modes, which makes them an optimal tool for balancing the power system. The implementation of the project will contribute to the development of regional infrastructure, the creation of new jobs, increased energy security, and sustainable socio-economic development of the Lviv region.
Budget1'337'840'600 UAH
Implementation period24 months