Education and science

The development of education and science plays a vital role in shaping human capital, advancing productive forces, and building an effective, innovative, and competitive economy.
This pipeline will present public investment projects and programs in the education and science sector that correspond to the areas of school, higher, postgraduate, vocational, and extracurricular education. These initiatives support the implementation of relevant national strategies in education and science. The Ministry of Education and Science of Ukraine is engaged in the preparation and development of projects and programs in these areas, forming a sectoral project pipeline at the national level and subsequently enriching it with public investment projects at the regional and local levels.
Indicative total public investment ceiling is 82'079'106'400 UAH
Responsible Ministry
MINISTRY OF EDUCATION AND SCIENCE OF UKRAINE
Indicative total public investment ceiling
82.1 bln
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches

Current set filters (Filtered result: 1384)

Project code: 240925-3A940160
Initiation date
Budget
Status
State level of SP
Local level of SPP
Local level of SP
Date09. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Reconstruction of building No. 3 of Kostopil Lyceum No. 1 named after T.G. Shevchenko for a dining room, a PRU and an assembly hall.

Project Goal
Increasing compliance with modern standards. Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions, Improving the quality of services
Geography
Kostopil city
Initiator
KOSTOPOL LYCEUM №1 NAMED AFTER T.G.SHEVCHENKO OF KOSTOPOL CITY COUNCIL
Maturity level
75
Comprehensive modernization of building No. 3 for a dining room
Construction of the dining hall building of Kostopil Lyceum No. 1 named after T.G.Shevchenko
The project involves a major reconstruction of building No. 3 in order to re-equip it as a modern school cafeteria that will meet safety, hygiene and energy efficiency standards. The modernization includes: renovation of premises, facade insulation, roof renovation; installation of modern technological equipment for preparing safe and balanced food; arrangement of water supply, ventilation, electricity supply and fire safety systems; creation of comfortable conditions for feeding students, including children with disabilities; energy-saving technologies and conditions for inclusion are provided.
Project cost54'045'000 UAH
Implementation period44 months