Education and science

The development of education and science plays a vital role in shaping human capital, advancing productive forces, and building an effective, innovative, and competitive economy.
This pipeline will present public investment projects and programs in the education and science sector that correspond to the areas of school, higher, postgraduate, vocational, and extracurricular education. These initiatives support the implementation of relevant national strategies in education and science. The Ministry of Education and Science of Ukraine is engaged in the preparation and development of projects and programs in these areas, forming a sectoral project pipeline at the national level and subsequently enriching it with public investment projects at the regional and local levels.
Indicative total public investment ceiling is 82'079'106'400 UAH
Responsible Ministry
MINISTRY OF EDUCATION AND SCIENCE OF UKRAINE
Indicative total public investment ceiling
82.1 bln
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches

Current set filters (Filtered result: 1431)

Project code: 240326-B80F4BED
Initiation date
Budget
Status
State level of SP
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Reconstruction of the building of the Horodok Primary School with the aim of arranging a catering unit at the address: 38 Shevchenko St., Horodok

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the quality of services
Geography
Horodok city
Initiator
HORODOTS CITY COUNCIL
Reconstruction of the primary school building to accommodate a catering unit
Modernization of the catering unit of the Horodotsk elementary school
The project involves a complete reconstruction of part of the school building with the redevelopment of the interior spaces for the needs of the catering unit: Dismantling work: Dismantling old partitions and decoration. Replacement of engineering networks: Updating the heating, water supply, drainage and ventilation systems. Technological arrangement: Allocation of areas for food storage, workshops for processing raw materials and a food preparation area. Fire prevention measures: Installation of warning systems, lightning protection and fire-resistant finishing of structures. Energy efficiency: Insulation of enclosing structures and installation of modern kitchen equipment.
Project cost23'900'228 UAH
Implementation period11 months