The project involves the construction of a capital underground building measuring 30.0x18.0 m on the territory of the institution made of monolithic reinforced concrete. The structure is classified as a P-6 radiation shelter with a protection factor of 100, designed for 330 people (consequence class SS2). The solution includes a full range of construction works (earthworks, concrete, waterproofing), interior decoration and equipment with autonomous engineering systems: supply and exhaust ventilation with filtration, water supply with water storage tanks, sewage with a pumping station, power supply with its own diesel power plant, as well as inclusion facilities (vertical lift, ramps).
Budget38'640'546 UAH
Implementation period12 months