Education and science

The development of education and science plays a vital role in shaping human capital, advancing productive forces, and building an effective, innovative, and competitive economy.
This pipeline will present public investment projects and programs in the education and science sector that correspond to the areas of school, higher, postgraduate, vocational, and extracurricular education. These initiatives support the implementation of relevant national strategies in education and science. The Ministry of Education and Science of Ukraine is engaged in the preparation and development of projects and programs in these areas, forming a sectoral project pipeline at the national level and subsequently enriching it with public investment projects at the regional and local levels.
Indicative total public investment ceiling is 82'079'106'400 UAH
Responsible Ministry
MINISTRY OF EDUCATION AND SCIENCE OF UKRAINE
Indicative total public investment ceiling
82.1 bln
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches

Current set filters (Filtered result: 1014)

Project code: 091225-26F543A2
Initiation date
Budget
Status
State level of SP
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Reconstruction of the building and canteen of the Letychiv Lyceum No. 2 on St. Ohienka Ivana, 1 smt. Letychiv, Khmelnytskyi district, Khmelnytskyi region.

Project goal
Improving the quality of services. Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Letychiv town
Initiator
LETYCHIV LYCEUM #2 OF THE LETYCHIV VILLAGE COUNCIL OF THE KHMELNYTSK DISTRICT OF THE KHMELNYTSK REGION
Reconstruction of the building and canteen of the Letychiv Lyceum No. 2 on St. Ohienka Ivana, 1 smt. Letychiv, Khmelnytskyi district, Khmelnytskyi region.
Engineering and equipment solutions
The reconstruction involves redevelopment without changing the geometric parameters, namely, reconstruction of the premises of the toilet and shower cubicles, dismantling of floors, interior decoration of walls, ceiling and floor; installation of an internal water supply and sewage system from existing intra-building systems: installation of a ventilation system; replacement of electrical wiring and electrical appliances.
Budget1'819'097 UAH
Implementation period4 months