"Reconstruction of existing buildings and construction of a new medical and rehabilitation building with engineering, technical and medical equipment of the Kyiv City Clinical Ophthalmological Hospital "Center for Eye Microsurgery" of the Ministry of Health of Ukraine" at the address: Kyiv, 3 Lyubomyr Huzar St.".
Major renovation of existing buildings without infrastructure expansion
Reconstruction of existing buildings with a total area of 7,737.20 sq. m. involves the modernization of operating departments and optimization of existing areas, taking into account the construction of a new treatment and rehabilitation building nearby, the creation of a brachytherapy department, the placement of a training simulation center for doctors and nurses on the hospital grounds, which will be equipped with modern equipment and tools for practicing technologies, methods and skills; a research laboratory; a training classroom, a conference hall and an adaptation space for the integration of people with disabilities into society. Reconstruction of the facades of existing buildings, taking into account current standards of energy saving, green tariff, fire safety, etc. with a total area of 9,297.04 sq. m. The construction of a new medical and rehabilitation building with a total building area of 4,960 sq. m. provides that the new building will be connected to the existing building, which will allow organizing convenient logistics for doctors and patients. Consequence class CC3, fire resistance level of the building II. Estimated number of employees 70 people/shift - new jobs. The structure of this medical and rehabilitation building includes a unique department of tumors of the organ of vision, radiotherapy and corneal bank (the hospital's human resources allow providing medical care using modern bioimplants, namely, performing surgical interventions to restore the anatomical and optical properties of the cornea), the first specialized department of functional digital diagnostics for 140 examinations per shift; a new rehabilitation department, which includes a patient school; children's and adult outpatient departments; clean operating block with 3 operating rooms with postoperative wards for 6 beds; “dirty” operating block with 2 operating rooms with postoperative wards for 6 beds; outpatient surgery with 2 operating rooms with postoperative wards for 6 beds; central sterilization department for the entire hospital; own laboratory, which includes general clinical, biochemical, cytological, immunological, hematological; eye prosthetics laboratory; modern shelter.
Project cost1'035'500'000 UAH
Implementation period36 months