The project involves the reconstruction of a 22.4 km section of the M-06 Kyiv - Chop highway (km 129.6 - km 151.73), which is due to the need to bring its parameters and safety features up to modern standards. The works are divided into 5 construction phases, within which it is planned to erect 7 artificial structures, 5 two-level traffic interchanges and install a capital road surface made of cement concrete with a thin-layer protective coating (LEMS). The completion of the reconstruction of the Zhytomyr bypass road will allow the transit freight flow to be completely removed from the city, which will significantly relieve the street network and improve the environmental situation in residential areas. Thanks to the modernization of the M-06 Kyiv - Chop highway, the level of traffic safety will dramatically increase, logistics in the strategic direction will be optimized and a powerful incentive will be created for the economic development of the entire region.
Budget6'375'388'443 UAH
Implementation period36 months