Municipal infrastructure and services

The reconstruction and modernization of damaged critical infrastructure is essential for restoring life in affected regions and ensuring comfortable living conditions for people across the entire territory of Ukraine.
This pipeline will present public investment projects and programs in the municipal infrastructure sector that focus on water supply and wastewater management and support the implementation of the sectoral development strategy. The Ministry for Communities and Territories Development of Ukraine is engaged in the preparation and development of projects and programs in these areas, forming a sectoral project pipeline at the national level and subsequently enriching it with public investment projects at the regional and local levels.
Indicative total public investment ceiling is 12'639'377'900 UAH
Responsible Ministry
MINISTRY OF DEVELOPMENT OF COMMUNITIES AND TERRITORIES OF UKRAINE
Indicative total public investment ceiling
12.6 bln
Project code
Keyword
Project coverage area
Number of alternative technical approaches

Current set filters (Filtered result: 1)

Project code: 040825-10E3F8AA
Initiation date
Project cost
Status
State level of SPP
State level of SP
Date08. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Construction of the Bolgrad group water pipeline for agricultural water supply in the Odesa region

Project Goal
Improving the equality of wealth distribution. Improving the condition of infrastructure
Geography
Bolhradska community, Vasylivska community, Kubeiska community, Suvorovska community
Initiator
INFRASTRUCTURE RESTORE AND DEVELOPMENT SERVICE IN ODESSA REGION
Maturity level
70
Construction of the Bolgrad group water pipeline for agricultural water supply in the Odesa region
Construction or modernization of small local water treatment plants (from wells, lakes)
Drilling local artesian wells in each settlement
Use of imported water (tankers, mobile containers)
The project involves the construction of a centralized water supply system that will provide high-quality drinking water to over 48,000 residents in 18 settlements in the south of the Odessa region. The source of water will be the Danube River, with further purification and transportation to communities through modern engineering infrastructure: pumping stations, treatment plants, main water supply and an extensive distribution network.
Project cost1'716'734'996 UAH
Implementation period30 months
Design documentationAbsent