Housing

Providing people with permanent housing is a state priority that directly influences the development of a stable and resilient economy.
This pipeline will present public investment projects and programs in the housing sector that correspond to housing-related priorities and support the implementation of the sectoral development strategy. The Ministry for Communities and Territories Development of Ukraine is engaged in the preparation and development of projects and programs in these areas, forming a sectoral project pipeline at the national level and subsequently enriching it with public investment projects at the regional and local levels.
Indicative total public investment ceiling is 18'460'379'400 UAH
Responsible Ministry
MINISTRY OF DEVELOPMENT OF COMMUNITIES AND TERRITORIES OF UKRAINE
Indicative total public investment ceiling
18.5 bln
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches

Current set filters (Filtered result: 2)

Project code: 071225-C24F6DAD
Initiation date
Budget
Status
State level of SP
Local level of SPP
Local level of SP
Date12. 2025
SectorHousing
SubsectorHousing Solutions
StatusInvestment Feasibility Study

Providing housing for residents of the Bakhmut urban territorial community (with IDP status) in safe regions of Ukraine.

Project goal
Creation of new facilities and services. Improving the equality of wealth distribution, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions
Geography
Hoshchanska community, Hoshcha town
Initiator
DEPARTMENT OF URBAN ECONOMY AND CAPITAL CONSTRUCTION DEVELOPMENT OF BAHMUT CITY COUNCIL
Construction of multi-apartment residential buildings with a steel frame.
Construction of multi-apartment residential buildings from reinforced concrete structures
Technical solution No. 2 provides for the construction of multi-apartment residential buildings in the village of Goshcha, Rivne district, Rivne region, made of a steel frame, reinforced concrete floor slabs, and enclosing wall structures. Measures are planned for the thermal modernization of buildings: installation of energy-efficient heating equipment, water supply, electricity supply, energy-efficient windows, doors, lighting, insulation of external walls and attics of buildings. Measures are also planned to create conditions for barrier-free access for low-mobility population groups. The implementation of this solution will allow the construction of residential buildings with a service life of ~ 100 years in approximately 3 years, and to provide safe and comfortable conditions for the residence of internally displaced persons.
Budget1'763'460'197 UAH
Implementation period36 months