This pipeline will present public investment projects and programs in the energy sector that align with the following areas: fossil fuels, renewable energy sources and alternative fuels, nuclear energy, electricity generation, and the oil and gas industry. These initiatives are aimed at supporting the implementation of the Energy Strategy of Ukraine. The Ministry of Energy of Ukraine is engaged in the preparation and development of projects and programs in these areas, forming a sectoral project pipeline at the national level and subsequently enriching it with public investment projects at the regional and local levels.
Indicative total public investment ceiling is 120'834'620'600 UAH, including funds from the State Fund for Decarbonization and Energy Efficiency Transformation in the amount of 6'930'983'900 UAH, and State Guarantees in the amount of 105'100'000'000 UAH
Responsible Ministry
MINISTRY OF ENERGY OF UKRAINE
Indicative total public investment ceiling
120.8 bln
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches

Current set filters (Filtered result: 77)

Project code: 250226-03084560
Initiation date
Budget
Status
State level of SP
Date02. 2026
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Increasing the resilience of the Kyiv energy system

Project Goal
Improving the condition of infrastructure. Improving the quality of services
Geography
Kyivska region
Initiator
PRIVATE JOINT STOCK COMPANY "NATIONAL ENERGY COMPANY "UKRENERGO"
Increasing the resilience of the Kyiv energy system
Not provided
To ensure the coverage of the load of consumers on the left bank of Kyiv and provide capacity for new connections on the left and right banks, it is planned to implement 2 stages of measures: 1st stage (2024-2027) - creation of a 110 kV network with a capacity of 426 MW and connection of new consumers with a capacity of 192 MW on the left bank through the reconstruction of the transit line "Darnytska CHPP - Kniazhychi - Brovary" and construction of a 110 kV transit line across the Dnieper River from the Novokyivska substation to the Darnytska CHPP 2nd stage (2026-2028) - construction of a new 110 kV transit line "Odesa - Demiivska" to ensure the target reserve of transit capacity and connection of new consumers with a capacity of 168 MW on the right bank (external financing is required)
Project cost2'359'721'171 UAH
Implementation period60 months