Energy Sector

The development of the energy sector has a decisive impact on the state of the national economy and the quality of life of the population.
This pipeline will present public investment projects and programs in the energy sector that align with the following areas: fossil fuels, renewable energy sources and alternative fuels, nuclear energy, electricity generation, and the oil and gas industry. These initiatives are aimed at supporting the implementation of the Energy Strategy of Ukraine. The Ministry of Energy of Ukraine is engaged in the preparation and development of projects and programs in these areas, forming a sectoral project pipeline at the national level and subsequently enriching it with public investment projects at the regional and local levels.
Indicative total public investment ceiling is 120'834'620'600 UAH, including funds from the State Fund for Decarbonization and Energy Efficiency Transformation in the amount of 6'930'983'900 UAH, and State Guarantees in the amount of 105'100'000'000 UAH
Responsible Ministry
MINISTRY OF ENERGY OF UKRAINE
Indicative total public investment ceiling
120.8 bln
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches

Current set filters (Filtered result: 66)

Project code: 140825-8645CE0E
Initiation date
Budget
Status
State level of SPP
State level of SP
Date08. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusPreliminary Investment Feasibility Study

New construction of a cogeneration complex based on gas piston units with a total capacity of up to 80 MW in Mykolaiv

Project goal
Capacity building. Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Creation of new jobs through project implementation, Improving the quality of services
Geography
Mykolaiv city
Initiator
PRIVATE JOINT-STOCK COMPANY "MYKOLAIV HEATING POWER PLANT"
Construction of a cogeneration complex based on gas piston plants with a total capacity of up to 80 MW
Construction of a combined cycle plant + waste heat boiler in a configuration of 31 MW thermal / 50 MW electric
Construction of a biomass steam boiler + backpressure turbine – 20 MW thermal / 5.7 MW electric
The project envisages the construction of new generating facilities located on the territory of the Mykolaiv CHPP. At the moment, a feasibility study of modernization options for PrJSC "MYKOLAIV CHPP" is being carried out with the help of donor assistance (Swedfund). One of the priority options is the installation of gas-piston units with a total capacity of up to 80 MW of electricity, operating in cogeneration mode. This will allow operation in the mode of multiple equipment starts without reducing the reliability of the equipment, choosing the most advantageous price position in the electricity market in terms of the day. The cogeneration component will compensate for part of the thermal capacity of the station with more advantageous specific costs for heat generation, reducing the cost of heat production by reducing heat generation on morally and physically obsolete equipment. In addition, electricity generation can be carried out year-round
Budget59'706'400'000 UAH
Implementation period36 months