The project includes two main groups of activities:
1. Study of the properties and technical condition of existing GTS facilities (220 km main gas pipeline and compressor station) for the possibility of their use and necessary adaptation measures for hydrogen transportation
2. Implementation of measures to adapt existing GTS facilities for hydrogen transportation: such as replacing crane units on the existing gas pipeline, construction of 37.5 MW of hydrogen compressor capacity at the compressor station.
Budget18'094'146'001 UAH
Implementation period60 months