In December 2015, a contract was signed with the consortium "GE Grid GmbH" (Germany) and LLC "Chornomorenergospetsmontazh" (Ukraine) for the supply of equipment and technical re-equipment of the 330 kV substation "Kryvorizhska" and the 330 kV substation "Dnipro-Donbas". In August 2022, the reconstruction of the 330 kV substation "Kryvorizhska" was completed and the facility was put into operation. Work on the 330 kV substation "Dnipro-Donbas" was suspended by the Contractor due to the introduction of martial law. The procedure is underway. termination of the contract due to force majeure circumstances associated with the armed aggression of the Russian Federation against Ukraine. In March 2024, final settlements were made with LLC «CHESM» (for equipment, services provided) for the technical re-equipment of the 330 kV substation «Kryvorizka».The project provides for:- Increasing reliability, reducing the accident rate in the operation of substations by installing modern electrical equipment manufactured using new materials and modern technologies;- Reducing costs during preventive maintenance (maintenance) by installing a reliable element base of RPA devices and power electrical equipment components;- Reducing emergency repair costs by updating equipment and reducing the use of consumables thanks to manufacturer warranties;- Increasing the reliability of generating capacities due to more reliable operation of power transmission networks, as well as increasing the reliability of electricity transit at the regional level and at the level of the Unified Power System of Ukraine as a whole.
Budget1'951'852'953 UAH
Implementation period204 months