The project is aimed at ensuring: rapid replacement and repair of damaged equipment necessary to restore the provision of critical energy services. increasing the level of protection of critical infrastructure facilities from drone attacks in the Russian Federation. maintaining reliable operation of the energy system and stable electricity supply. reducing the risks of power supply interruptions for the population and industry. increasing the reliability of the electricity transmission system. increasing the efficiency of the functioning of the unified energy system of Ukraine.
Budget8'276'000'003 UAH
Implementation period32 months