Alternative solution 1 using wind turbines with lower unit capacity
Alternative solution 2 using wind turbines with higher unit capacity
The solution involves the construction of a wind farm with a total capacity of 57.6 MW using wind turbines with a lower unit capacity (up to 4.8 MW); total number of wind turbines: 12 units. Compared to wind turbines with a higher capacity, the specific cost of the wind turbine and the cost of servicing per 1 MW, the utilization factor of the installed capacity (approximately 43.0%) is higher.
Project cost5'106'219'079 UAH
Implementation period104 months