The alternative solution involves the construction and commissioning of a gas-fired power plant with a total installed capacity of up to 20 MW, operating on natural gas and intended for the production of electricity with the possibility of participating in the day-ahead market and the market of ancillary services of NPC Ukrenergo. Gas-fired power plants provide high maneuverability, quick starts and stops, as well as stable operation under variable load conditions, which makes them suitable for covering peak loads and balancing the Unified Energy System of Ukraine.
Budget1'495'794'633 UAH
Implementation period24 months