Energy Sector

The development of the energy sector has a decisive impact on the state of the national economy and the quality of life of the population.
This pipeline will present public investment projects and programs in the energy sector that align with the following areas: fossil fuels, renewable energy sources and alternative fuels, nuclear energy, electricity generation, and the oil and gas industry. These initiatives are aimed at supporting the implementation of the Energy Strategy of Ukraine. The Ministry of Energy of Ukraine is engaged in the preparation and development of projects and programs in these areas, forming a sectoral project pipeline at the national level and subsequently enriching it with public investment projects at the regional and local levels.
Indicative total public investment ceiling is 120'834'620'600 UAH, including funds from the State Fund for Decarbonization and Energy Efficiency Transformation in the amount of 6'930'983'900 UAH, and State Guarantees in the amount of 105'100'000'000 UAH
Responsible Ministry
MINISTRY OF ENERGY OF UKRAINE
Indicative total public investment ceiling
120.8 bln
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches

Current set filters (Filtered result: 77)

Project code: 060326-F3757C29
Initiation date
Budget
Status
State level of SPP
State level of SP
Date03. 2026
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Installation of a gas-fired power plant up to 10 MW in Ivano-Frankivsk region: Project FII

Project goal
Capacity building. Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Creation of new facilities and services, Rebuilding the damaged/destroyed, Improving the equality of wealth distribution, Increasing the even distribution of resources, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Creation of new jobs through project implementation, Поява нових виробничих потужностей, Meeting demand
Geography
Ivano-Frankivska region
Initiator
JOINT STOCK COMPANY "UKRNAFTA"
Maturity level
85
Installation of a gas-fired power plant with a capacity of up to 10 MW
Construction and commissioning of a solar power plant (SPP) with a capacity of 21 MW
The alternative solution involves the construction and commissioning of a gas-fired power plant with a total installed capacity of up to 10 MW, operating on natural gas and intended for the production of electricity with the possibility of participating in the day-ahead market and the market of ancillary services of NPP "Ukrenergo". Gas-fired power plants provide high maneuverability, quick starts and stops, as well as stable operation under variable load conditions, which makes them suitable for covering peak loads and balancing the Unified Energy System of Ukraine.
Budget761'758'495 UAH
Implementation period24 months