The main objective of the project "Construction of a 750 kV overhead line of Zaporizhia NPP - Kakhovka" (hereinafter referred to as the Project) is to increase the reliability of the southern operating modes of the Unified Power System of Ukraine by removing network restrictions on the output of the Zaporizhia NPP, stabilizing the voltage in the Southern and Crimean power systems (PS), and increasing the throughput capacity of the southern sections by strengthening the connection of the Kakhovka power node with the main networks of the Unified Power System of Ukraine.
Budget6'000'000'002 UAH
Implementation period180 months