The alternative technical solution involves the reconstruction and comprehensive restoration of the operational characteristics of the hydraulic structures of the Osnytskyi Reservoir with the return of the design geometric parameters of the reservoir bed. The planned measures include: major repairs of hydraulic structures (in particular, spillway and water-regulating elements); cleaning and widening of the channel part with the restoration of design depths; ensuring stable water regulation and preventing further siltation; increasing the reliability of structures and the level of flood protection of adjacent territories; preventing the negative impact of flooding on agricultural lands and infrastructure. The proposed solution will ensure the long-term and safe operation of the reservoir, stabilization of the hydrological regime and improvement of the ecological state of the facility.
Budget12'950'000 UAH
Implementation period18 months