Environment

The environment involves the balanced use of the country's natural resources, protection of the natural environment, and the achievement of sustainable development.
This pipeline will present public investment projects and programs in the environmental sector, which correspond to environmental protection areas, as well as to activities within the exclusion zone; waste management, including radioactive waste; forest protection, forestry and hunting management; water protection, development of water management, administration, use, and restoration of surface water resources; and subsoil use. These initiatives are aimed at supporting the implementation of the State Environmental Policy Strategy of Ukraine. The Ministry of Environmental Protection and Natural Resources of Ukraine is engaged in the preparation and development of projects and programs in these areas, forming a sectoral project pipeline at the national level, and subsequently enriching it with public investment projects at the regional and local levels.
Indicative total public investment ceiling is 702'526'600 UAH, including funds from the State Radioactive Waste Management Fund in the amount of 591'526'600 UAH and funds from the State Water Management Development Fund in the amount of 111'000'000 UAH
Responsible Ministry
MINISTRY OF ECONOMY OF UKRAINE
Indicative total public investment ceiling
702.5 mln
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches

Current set filters (Filtered result: 11)

Project code: 130226-480F5779
Initiation date
Budget
Status
State level of SP
Date02. 2026
SectorEnvironment
SubsectorWater protection, water management development, flood risk mitigation, centralized water supply, management, use and restoration of surface water resources
StatusInvestment Feasibility Study

Overhaul of the hydroelectric complex on the Putylivka River (Zhobryn village, Klevan territorial community, Rivne district, Rivne region)

Project goal
Rebuilding the damaged/destroyed. Improving the condition of infrastructure
Geography
Zhobryn village
Initiator
NORTHERN INTER-DIVISIONAL WATER MANAGEMENT DEPARTMENT
MAJOR REPAIR OF AN EXISTING HYDRAULIC UNIT
CURRENT REPAIR WITHOUT COMPLETE RECONSTRUCTION
The alternative solution involves overhauling the existing hydroelectric power plant with the restoration of its structural elements, hydraulic structures and engineering systems, taking into account modern technical, safety and environmental requirements. As part of the implementation of the solution, it is planned to replace worn-out structures, restore the capacity of the structure, strengthen the banks and the riverbed, as well as implement measures to increase the reliability and durability of the facility. The implementation of the overhaul will ensure stable and safe operation of the hydroelectric power plant, reduce the risks of flooding of nearby territories, contribute to the protection of the population and infrastructure, and also have a positive impact on the state of aquatic and coastal ecosystems.
Budget8'600'000 UAH
Implementation period18 months