Major renovation of the educational building with modernization of the fire protection system of the Knyahynynivka Lyceum of the Volyn Regional Council at 72 Soborna Street, Knyahynynok village, Lutsk district, Volyn region Major repairs of the educational building (fire protection) of the Knyahynynivka Lyceum of the Volyn Regional Council at the address: Knyahynynok village, Soborna St., 72
The project is aimed at creating a modern, safe and energy-efficient educational space in accordance with state safety standards. The technical solution has a number of significant advantages. Economically, the project allows you to optimize the costs of maintaining the building through the use of modern materials and technologies that reduce the need for frequent repairs and maintenance. Installation of energy-saving lighting and automated control systems will ensure a reduction in energy consumption and utility costs. Rational use of funds occurs by directing investments exclusively to eliminate violations specified by the regulations of the State Emergency Service, without excessive costs. In addition, the modernization of fire protection systems will prevent possible economic losses in the event of emergencies, contributing to an increase in the value of the institution's fixed assets. Environmental advantages consist in the use of energy-efficient technologies that reduce resource consumption and emissions of harmful substances into the environment. In the process of performing work, compliance with requirements for construction waste management, separate collection and disposal of materials is provided. The implementation of the project contributes to the formation of an environmentally conscious environment and the development of a culture of careful attitude towards nature among participants in the educational process. Social benefits are decisive. The project will ensure an increase in the level of safety and comfort for 450 students and employees of the lyceum, as well as create conditions for continuous full-time education even under martial law.
Project cost5'830'000 UAH
Implementation period4 months
Design documentationAbsent