According to the latest inspections of the transport hub at the intersection of Air Force Avenue with Borshchagovskaya Street and Zhylyanskaya Street, two bridge structures are in an inoperable condition (State 5), the other two structures are in a limited operable condition (State 4). According to the conclusions of the inspections, these structures require repair work (overhaul). Existing defects in the overpass structures are progressing and negatively affect the reliability and durability of the structure, and also reduce the level of safety for motor vehicles and pedestrians, both on the structures and under them.Conducting works on the overhaul of the bridge structure will allow bringing the geometric parameters and operational qualities of the structure elements in accordance with the requirements of current regulatory documents. It will ensure safe and uninterrupted movement for all road users.
Project cost574'809'476 UAH
Implementation period36 months