KYIV CITY STATE ADMINISTRATION


About the region
Regional SPP
Regional SP
Region MTP
All sectors
439
Projects
Projects by sectors
439
Projects
Projects by goal
439
Projects
Projects by status
12'187,09 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Initiator
Project cost
Status

Current set filters (Filtered result: 439)

Project code: 280426-1057CEC2
Initiation date
Project cost
Status
Regional level of SP
Date04. 2026
SectorTransport Sector
SubsectorRoad transport and road infrastructure
StatusInvestment Feasibility Study

MAJOR REPAIR OF THE TRANSPORT INTERSECTION AT THE INTERSECTION OF AIR FORCES AVENUE WITH BORSCHAGIVSKA STREET AND ZHYLIANSKA STREET IN THE SOLOMYANSKI AND SHEVCHENKIVSKI DISTRICT OF KYIV

Project Goal
Improving the condition of infrastructure. Increasing compliance with modern standards
Geography
Kyiv city
Initiator
UTILITY CORPORATION "KYIVAVTODOR"
MAJOR REPAIR OF THE TRANSPORT INTERSECTION AT THE INTERSECTION OF AIR FORCES AVENUE WITH BORSCHAGIVSKA STREET AND ZHYLIANSKA STREET IN THE SOLOMYANSKI AND SHEVCHENKIVSKI DISTRICT OF KYIV
Reconstruction of the transport hub at the intersection of Air Force Avenue with Borschagivska Street and Zhylyanska Street in Solomiansky and Shevchenkivsky districts of Kyiv
According to the latest inspections of the transport hub at the intersection of Air Force Avenue with Borshchagovskaya Street and Zhylyanskaya Street, two bridge structures are in an inoperable condition (State 5), the other two structures are in a limited operable condition (State 4). According to the conclusions of the inspections, these structures require repair work (overhaul). Existing defects in the overpass structures are progressing and negatively affect the reliability and durability of the structure, and also reduce the level of safety for motor vehicles and pedestrians, both on the structures and under them.Conducting works on the overhaul of the bridge structure will allow bringing the geometric parameters and operational qualities of the structure elements in accordance with the requirements of current regulatory documents. It will ensure safe and uninterrupted movement for all road users.
Project cost574'809'476 UAH
Implementation period36 months

In focus

All news