Myhiivska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
8
Projects
Projects by sectors
8
Projects
Projects by goal
8
Projects
Projects by status
91,86 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Project cost
Status

Current set filters (Filtered result: 8)

Project code: 311025-5DCA799E
Initiation date
Project cost
Status
Local level of SPP
Local level of SP
Date11. 2025
SectorEducation and science
SubsectorPreschool education
StatusInvestment Feasibility Study

New construction of a protective structure (radiation shelter) for the population and students on Yosypa Skarzhynskoho Street in the village of Mygiya, Pervomayskyi district, Mykolaiv region

Project Goal
Improving the condition of infrastructure. Improving the equality of wealth distribution, Ensuring inclusiveness and equal opportunities
Geography
Myhiivska community
Initiator
MIGIIVSK VILLAGE COUNCIL
Maturity level
84
New construction of a civil defense protective structure (radiation shelter) for the population and students on Yosypa Skarzhynskyi Street in the village of Mygiya, Pervomayskyi District, Mykolaiv Region
Arrangement of a modular, quick-demolition structure (shelter)
Current renovation of the basement of the "Romashka" residential complex for the simplest shelter
A new construction of a civil defense protective structure (radiation shelter) is planned in the village of Mygiya, Pervomaysky district, Mykolaiv region. The radiation shelter is planned to be built for the population and students (preschoolers of the "Romashka" preschool educational institution of Mygiya village council. The protective structure of the PRU is equipped with internal engineering networks and systems: heating, ventilation, water supply, sewage, power supply, electric lighting, fire alarm and fire notification system, security alarm system, communication systems, gas control system, smoke protection system, structured cable networks, video surveillance.
Project cost56'414'055 UAH
Implementation period24 months
Design documentationAvailable

In focus

All news