Emergency restoration work (overhaul) of an apartment building at Lesya Serdyuka St., 48/2 in Kharkiv
Emergency and restoration works (overhaul) of an apartment building at 48/2 Lesya Serdyuka St. in Kharkiv with the integration of renewable energy sources
The apartment building, which suffered significant damage as a result of military operations and is subject to major repairs, is located at 48/2 Lesya Serdyuka Street and is located in the Kyiv administrative district of Kharkiv.
As a result of the impact of the weapons, there was extensive damage to the wall panels, floor slabs, covering slabs, partitions, balcony floor slabs, the enclosing walls of the building's balconies, and the exterior decoration of the building. The entrance group of the 6th entrance was damaged, and the glazing of window, balcony openings and window frames on the facades of the residential building was also partially destroyed as a result of the explosion of the means of destruction.
The working project of the major repair provides for emergency and restoration work, namely:- dismantling of all damaged structures;- restoration of destroyed and damaged wall structures;- restoration of destroyed and damaged sections of the ceiling and covering of structures;- local reinforcement of wall panels and floor slabs;- installation of a new roof on the destroyed areas and restoration on the damaged areas;- restoration of destroyed and damaged internal partitions;- restoration of completely destroyed balcony slabs;- restoration of damaged balcony slab fencing;- restoration of destroyed and damaged ventilation ducts;- replacement of destroyed and damaged window and door fillings with metal-plastic window and balcony doors with double-glazed windows;- restoration of insulation facade;- restoration of the insulation of the roof of the engine room;- restoration of the insulation of the attic floor;- restoration of the entrance group of entrance No. 6;- restoration of the destroyed and damaged engineering communications of the building (cold and hot water supply, sewage, drainage, heating);- restoration of the blind area around the building. The detailed design provides for measures regarding reliability and safety, protection of building structures from corrosion, lightning protection and grounding.
The design solutions provide for changing the existing conditions of accessibility of the building for low-mobility groups, namely the arrangement of unhindered access:- by arranging external lifts from ground level to the entrance to the building in entrances 1-6;- arrangement of external ramps at the entrances to entrances 7-9;- arrangement of internal lifts in all entrances from the entrance platform to the elevator hall of the first floor.
Project cost81'265'223 UAH
Implementation period22 months