Kharkivska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
263
Projects
Projects by sectors
263
Projects
Projects by goal
263
Projects
Projects by status
64'815,13 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Project cost
Status

Current set filters (Filtered result: 263)

Project code: 050226-6BCF8303
Initiation date
Project cost
Status
Local level of SP
Date03. 2026
SectorHousing
SubsectorHousing Reconstruction
StatusPreliminary Investment Feasibility Study

Emergency and restoration works (overhaul) of the multi-apartment residential building of the “Vienna House” condominium association at 42 Krychevsky Street in Kharkiv

Project Goal
Rebuilding the damaged/destroyed. Increasing compliance with modern standards, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Improving the quality of services, Reducing territorial or social gaps
Geography
Kharkiv city
Initiator
DEPARTMENT OF BLAGOUSTRA, CONSTRUCTION AND RECONSTRUCTION OF THE KHARKIV CITY COUNCIL
Emergency and restoration works (overhaul) of the multi-apartment residential building of the “Vienna House” condominium association at 42 Krychevsky Street in Kharkiv
Emergency and restoration works (overhaul) of the multi-apartment residential building of the “Vienna House” condominium at 42 Krychevsky St. in Kharkiv with the integration of renewable energy sources
The apartment building, which suffered significant damage as a result of military operations and is subject to major repairs, is located at 42 Krychevsky Street and is located in the Kyiv administrative district of the city of Kharkiv. As a result of the impact of the means of destruction, the house was damaged: - brick wall of the 4th floor of the 2nd entrance; - exterior decoration of the 2nd, 3rd entrances; - ceiling of the 4th floor of the 2nd, 3rd entrances; - burning of the roof of the 2nd, 3rd entrances; - interior decoration of the entrances, numerous cracks in the stairwells. In the house as a whole, partial destruction of the glazing of window openings and window frames was found, the facade of the residential building was partially damaged as a result of the fire. The working project of the major repair provides for emergency and restoration work, namely: - dismantling of all damaged structures); - restoration of external and internal brick walls by laying masonry, installation of new partitions instead of destroyed ones made of aerated concrete blocks with reinforcement; - restoration of the damaged reinforced concrete slab 4th floor overlap with the installation of steel beams with subsequent execution of a section of monolithic reinforced concrete overlap; - installation of a new wooden roof truss system with wood treatment with antiseptic agents and fire protection; - restoration of ventilation ducts on the attic floor by bricklaying; - installation of roofs on the restoration areas with bitumen tiles with insulation of the attic covering; - restoration of the external drainage system of the house, snow retention system and roof fencing, installation of lightning protection; - insulation of the basement ceiling with mineral wool; - installation of stairs on the mezzanine of the 3rd and 4th floors; - replacement of damaged window openings (installation of window sills and window drains, repair and installation of external window slopes); - replacement of damaged glazing of attic windows with energy-saving metal-plastic with double-chamber glazing double-glazed windows and gluing of colored film on the outside. Replacement of damaged external and internal doorways of public use and apartments with shockproof and fire-resistant metal ones; - repair and restoration of entrance groups (including canopies above entrances to entrances and basements); - insulation of the facade with mineral wool boards with decorative trim; - restoration of interior trim in public areas; - restoration of damaged internal engineering networks (cold and hot water supply, sewage, drainage, heating, ventilation). The detailed design provides for measures for reliability and safety, protection of building structures from corrosion, lightning protection and grounding.
Project cost72'833'804 UAH
Implementation period15 months