Rohatynska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
7
Projects
Projects by sectors
7
Projects
Projects by goal
7
Projects
Projects by status
14,72 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Project cost
Status

Current set filters (Filtered result: 7)

Project code: 271025-FBDB364C
Initiation date
Project cost
Status
Local level of SPP
Local level of SP
Date10. 2025
SectorEducation and science
SubsectorExtracurricular education
StatusInvestment Feasibility Study

Reconstruction of the shooting range of the Rohatyn Specialized Children's and Youth Sports School of Olympic Reserve at 71 V Shevchenko St. in the city of Rohatyn, Ivano-Frankivsk region

Project Goal
Increasing compliance with modern standards. Improving the condition of infrastructure
Geography
Rohatynska community
Initiator
Rohatyn City Council Education Department
Maturity level
79
Reconstruction of the shooting range of the Rohatyn Specialized Children's and Youth Sports School of Olympic Reserve at 71 V Shevchenko St. in the city of Rohatyn, Ivano-Frankivsk region
Maintaining the facility in its current state
Reconstruction of the shooting range eliminates leaks and emergency risks, restores the load-bearing and protective capacity of the roof and brings the thermal performance to the requirements of DBN V.2.6-31:2021; ensures compliance with safety standards (CMU No. 1207 of 12/27/2018, No. 375 of 04/04/2025, Order of the Ministry of Internal Affairs No. 881 of 10/31/2023) for the operation of a closed shooting range and opens the possibility of obtaining a permit from the National Police. Thanks to insulation and a new roofing "pie", heat loss and annual maintenance costs are reduced compared to maintenance in the existing state; installation of lightning protection and restoration of drainage increase safety, and the service life of the building is extended, preventing further corrosion. As a result, stable regulatory conditions are created for training 186 students and holding competitions, which supports the high status of the SDYUSSHOR.
Project cost3'685'000 UAH
Implementation period8 months
Design documentationAbsent

In focus

All news