Project code: 230226-74A416AA
Initiation date
Project cost
Status
Local level of SPP
Local level of SP
Date02. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Reconstruction (carrying out work to prepare for the heating season and implementing energy saving measures) of the heating system of Secondary School No. 13 at 13 Rosvyhivska Street in Mukachevo

Project Goal
Increasing compliance with modern standards.
Geography
Mukachevo city
Initiator
Department of Construction and Infrastructure of the Mukachiv City Council
Maturity level
81
Reconstruction (carrying out work to prepare for the heating season and implementing energy saving measures) of the heating system of Secondary School No. 13 at 13 Rosvyhivska Street in Mukachevo
Comprehensive thermal modernization of the building of Secondary School No. 13 at 13 Rosvyhivska Street in Mukachevo with modernization of heat supply systems and introduction of renewable energy sources
Reconstruction of the heating system of Secondary School No. 13 in Mukachevo involves preparation for the heating season and implementation of energy-efficient measures. The project addresses the critical need for stable heat supply to the educational institution and reduction of energy consumption. The existing system is worn out, which leads to heat loss, high costs and the risk of disruption of the educational process in winter. The implementation of the project will provide comfortable conditions for students and staff, reduce energy costs and increase the environmental friendliness of operation. It is expected to increase thermal efficiency, save resources and improve the infrastructure of the institution.
Project cost10'333'838 UAH
Implementation period5 months