Project code: 190226-F07DA667
Initiation date
Project cost
Status
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Construction of a new line of pressure sewer collector from the State Water Supply and Sewerage Administration (16 Ivan Gonty St.) to KOS-1 – KOS-2 in the city of Zhytomyr. 2nd stage (correction)

Project Goal
Improving the quality of services.
Geography
Zhytomyrska community, Zhytomyr city
Initiator
DEPARTMENT OF MUNICIPAL ECONOMY OF ZHYTOMYR CITY COUNCIL
Construction of a new line of pressure sewer collector from the State Water Supply and Sewerage Administration (16 Ivan Gonty St.) to KOS-1 – KOS-2 in the city of Zhytomyr. 2nd stage (correction)
Maintaining the existing network
The reconstruction of the treatment facilities will solve 2 important problems for the city: environmental and economic. New treatment facilities with a capacity of 62 thousand m3 per day will allow transferring all capacities to one site outside the city and purifying wastewater in accordance with European directives and standards. Automation of processes and operation of exceptionally energy-efficient equipment will allow significant savings in the wastewater treatment process. Completion of the reconstruction of the sewage treatment facilities 2 will allow decommissioning of the sewage treatment facilities 1. All wastewater entering the Main Sewerage Pumping Station (SPS) is pumped through a collector with a diameter of 1000 mm, which runs through the territory of the sewage treatment facilities (STP 1). Then one thread of the specified collector runs to the sewage treatment facilities 2 (STP 2). Emergency backup collectors are present only between the GKNS site and OSK 1. To switch to operation only OSK 2 and discontinue the use of the OSK 1 site, it is necessary to build a backup sewer collector line with a length of 2,500 m between these sites, which is planned as the second stage of construction of the project.
Project cost170'702'174 UAH
Implementation period36 months