The project provides for the construction of a sewer collector for the discharge of domestic wastewater from private manor houses. The project was implemented in accordance with DBN V.2.5-75:2003 "Sewerage. External networks and structures", current GOSTs and other regulatory documents. Domestic wastewater from individual residential buildings on I. Franka Street in the city of Zbarazh is planned to be discharged by the design sewer network into the existing city sewer collector, which crosses I. Franka Street in its lower part. The external networks of the domestic sewage network are designed from KORSIS ODP SN8 DSTU N B.V.2.5-40:2009 pipes, which will be laid in the ground at a depth according to the completed profile. The length of the sewer network is 1109 linear meters; the number of sewer wells is 64; the number of manor houses for domestic wastewater discharge by the design collector is 59; class consequences SS2; estimated amount of domestic wastewater 23 cubic meters/day, 8280 cubic meters/year.
Project cost8'774'310 UAH
Implementation period5 months
Design documentationAbsent