Maiakivska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
34,46 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 181225-3E30EE51
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date12. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Overhaul of water supply networks from the connection point (M15 Odesa-Reni highway) - Liebenthal village - Yosypivka village

Project goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the equality of wealth distribution, Increasing the even distribution of resources, Introducing innovations and energy-efficient solutions, Improving the quality of services, Reducing territorial or social gaps
Geography
Maiakivska community, Yosypivka village, Libental village
Initiator
DEPARTMENT OF URBAN PLANNING, ARCHITECTURE, LAND MANAGEMENT, ENVIRONMENT, HOUSING AND COMMUNAL MANAGEMENT AND COMMUNAL PROPERTY OF MAYAKIV VILLAGE COUNCIL
Major repairs of water supply networks from the connection point
Construction and renovation of the water supply network using horizontal directional drilling (HDD) and rehabilitation of existing pipelines
The project involves the complete replacement of damaged pipes and water wells by laying a new network parallel to the existing route without dismantling it. Pressure polyethylene pipes PE 80 SDR-17 with diameters of 160 mm, 110 mm, 63 mm and 50 mm are used. The main laying method is open in a trench at a depth of 1.3-1.6 m. Crossings under roads are made by the method of pushing in steel casings (DN 325 mm, 273 mm and 159 mm) with very reinforced insulation. The system includes 76 reinforced concrete wells and 33 fire hydrants.
Budget34'462'725 UAH
Implementation period6 months

In focus

All news