Kulykivska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
13
Projects
Projects by sectors
13
Projects
Projects by goal
13
Projects
Projects by status
86,15 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Project cost
Status
Initiation date
Project cost
Status
Local level of SP
Date04. 2026
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Major repairs to insulate part of the premises and arrange an entrance to the basement of the hospital building (therapeutic building)

Project Goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Improving the quality of services
Geography
Kulykivska community
Initiator
KULIKIV VILLAGE COUNCIL
Major repairs to insulate part of the premises and install an entrance to the basement of the hospital building
Current renovation of internal premises with modernization of engineering networks and use of existing access to the basement
The major renovation involves insulating part of the premises of the therapeutic building of the hospital in order to increase the building's energy efficiency, reduce heat loss and create more comfortable conditions for patients and staff. Additionally, a separate entrance to the basement is planned, which provides convenient and independent access to it and expands the possibilities of its functional use.
Project cost2'429'265 UAH
Implementation period10 months
Local level of SP
Date03. 2026
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Major renovation of the therapeutic building with insulation and installation of an accessible porch (Kulykivka)

Project Goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Improving the quality of services
Geography
Kulykivska community
Initiator
KULIKIV VILLAGE COUNCIL
Major renovation of the therapeutic building with insulation and installation of an accessible porch
Reconstruction of the therapeutic building with modernization of engineering systems and installation of a universal barrier-free entrance.
The major renovation of the therapeutic building with facade insulation and the arrangement of an accessible porch involves increasing the building's energy efficiency, creating comfortable conditions for patients and staff, and ensuring barrier-free access for people with limited mobility.
Project cost3'691'227 UAH
Implementation period10 months
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creation of an educational space within the framework of the "New Ukrainian School" reform in the Kulykiv Lyceum of the Kulykiv Village Council of the Chernihiv District of the Chernihiv Region

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the quality of services
Geography
Kulykivka town
Initiator
KULIKIVSKY LYCEUM OF KULIKIVSKY VILLAGE COUNCIL OF CHERNIGIVSKY DISTRICT OF CHERNIGIVSKY REGION
Creation of an educational space within the framework of the "New Ukrainian School" reform in the Kulykiv Lyceum of the Kulykiv Village Council of the Chernihiv District of the Chernihiv Region
Partial renovation of the material and technical base within the framework of the "New Ukrainian School" reform in the Kulykiv Lyceum of the Kulykiv Village Council of the Chernihiv District of the Chernihiv Region
Updating the modern educational space, inconsistency of equipment, which makes it impossible to ensure the educational process at the level of modern standards
Project cost10'500'000 UAH
Implementation period24 months
State level of SP
Local level of SPP
Local level of SP
Date02. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creation of an educational space within the framework of the "New Ukrainian School" reform - Kulykivska territorial community

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the quality of services
Geography
Kulykivska community
Initiator
KULIKIV VILLAGE COUNCIL
Maturity level
82
Creation of an educational space within the framework of the "New Ukrainian School" reform - Kulykivska territorial community
Rental of teaching aids and equipment within the framework of the implementation of the "New Ukrainian School" reform
Creating a modern educational space
Project cost345'951 UAH
Implementation period4 months
State level of SP
Local level of SPP
Local level of SP
Date02. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Reconstruction of the cafeteria and dining hall of the Kulykiv Lyceum of the Kulykiv Settlement Council of the Chernihiv District of the Chernihiv Region at the address: st. Shevchenka, 4, Kulikivka village, Chernihiv district, Chernihiv region

Project Goal
Increasing compliance with modern standards. Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions, Improving the quality of services, Reducing territorial or social gaps
Geography
Kulykivska community
Initiator
KULIKIVSKY LYCEUM OF KULIKIVSKY VILLAGE COUNCIL OF CHERNIGIVSKY DISTRICT OF CHERNIGIVSKY REGION
Maturity level
90
Reconstruction of the cafeteria and dining hall of the Kulykiv Lyceum of the Kulykiv Settlement Council of the Chernihiv District of the Chernihiv Region at the address: st. Shevchenka, 4, Kulikivka village, Chernihiv district, Chernihiv region
Partial modernization of the catering unit without comprehensive replacement of engineering networks
The public investment project involves a comprehensive modernization of the catering unit of the Kulykivsky Lyceum in order to create a modern support kitchen to ensure high-quality and safe nutrition for more than 1,100 students. The project includes redevelopment of the premises in accordance with functional zoning, which ensures compliance with the principles of the Hazard Analysis and Critical Control Points (HACCP) system and the requirements of Code 4:2024 on the organization of catering in educational institutions.
Project cost18'734'538 UAH
Implementation period6 months
Local level of SP
Date02. 2026
SectorSocial sector
SubsectorSocial services
StatusInvestment Feasibility Study

Creation of the Center for Sustainability - by reconstructing the building at the address: 16300, Kulykivka village, Mykola Amosova street, house 1, Chernihiv district, Chernihiv region

Project Goal
Improving the quality of services. Increasing compliance with modern standards
Geography
Kulykivska community
Initiator
KULIKIV VILLAGE COUNCIL
Creation of the Center for Resilience
New construction of a building to house the Center for Resilience
The project solution is to reconstruct and renovate the existing building to create a Resilience Center, which will ensure the functioning of a permanent, accessible, and safe space for providing comprehensive psychosocial services to community residents.
Project cost7'580'634 UAH
Implementation period12 months
Local level of SPP
Local level of SP
Date11. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Overhaul of the sports hall of the Kulykiv Lyceum of the Kulykiv Settlement Council of the Chernihiv District, Chernihiv Oblast on St. Shevchenko, 4, in the village of Kulikivka

Project Goal
Increasing compliance with modern standards. Ensuring inclusiveness and equal opportunities
Geography
Kulykivska community
Initiator
KULIKIV VILLAGE COUNCIL
Maturity level
83
Gym renovation
Cosmetic renovation of the gym
The renovation of the sports hall involves carrying out a set of works aimed at restoring the technical condition of the premises, improving the conditions for physical education classes and ensuring the safety of users. The works include floor repair with replacement of the coating, updating the walls and ceiling, replacing windows and doors, upgrading the lighting, heating and ventilation systems, as well as installing new sports equipment. The implementation of the measures will create a modern, comfortable and energy-efficient space for conducting training classes and sports events.
Project cost11'928'443 UAH
Implementation period10 months
Local level of SPP
Local level of SP
Date11. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

"New construction of a five-box garage on the territory of the Kulykivka Lyceum of the Kulykivka Village Council of the Chernihiv District of the Chernihiv Region at the address: 16300, Shevchenko Street, 4, Kulykivka Township, Chernihiv District, Chernihiv Region"

Project Goal
Improving the condition of infrastructure. Improving the quality of services
Geography
Kulykivska community
Initiator
KULIKIV VILLAGE COUNCIL
Maturity level
83
Construction of 5-bay garages
Bus lift
The project includes the construction of an insulated building with capital walls, a modern roof, gates with increased thermal insulation and the arrangement of the internal space in accordance with the requirements of safe transport operation. It is planned to connect engineering networks (electricity, lighting, ventilation, drainage system), arrange entrances, a drain, places for technical inspection and maintenance of buses. The implementation of the solution will ensure reliable, protected and energy-efficient storage of the entire fleet, extend the service life of equipment, reduce repair costs and guarantee the uninterrupted operation of the community transport service.
Project cost9'134'305 UAH
Implementation period10 months
Local level of SPP
Local level of SP
Date11. 2025
SectorCulture and information
SubsectorArts and Specialized Arts Education
StatusInvestment Feasibility Study

Reconstruction of the building of the municipal institution "Kulikovska Art School" of the Kulykivska Village Council using energy-saving technologies through modernization at the address: 16300, 1st Myru Lane, 6A, Kulykivka village, Chernihiv district, Chernihiv region

Project Goal
Introducing innovations and energy-efficient solutions. Improving the condition of infrastructure
Geography
Kulykivska community
Initiator
KULIKIV VILLAGE COUNCIL
Maturity level
83
Reconstruction of the building of the municipal institution "Kulikov Art School"
Partial cosmetic renovation of interior spaces without comprehensive thermal modernization
Insulation of the facade and roof, modernization of the heating and ventilation system, energy-efficient lighting, renovation of engineering networks, internal work to improve comfort and accessibility, creation of a barrier-free environment.
Project cost1'773'275 UAH
Implementation period7 months
Local level of SPP
Local level of SP
Date11. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Major repairs (thermal modernization) of the outpatient and polyclinic building of the KNP "Kulykivska LPL" at the address: Chernihiv region, Kulykivka village, 16 Pyrohova Street"

Project Goal
Introducing innovations and energy-efficient solutions. Improving the condition of infrastructure
Geography
Kulykivska community
Initiator
KULIKIV VILLAGE COUNCIL
Maturity level
83
Comprehensive thermal modernization of the outpatient clinic building
Partial modernization of the building with only cosmetic repairs
The main technical solution is a comprehensive thermal modernization of the outpatient and polyclinic building. The solution includes insulation of the facade and roof, the use of energy-efficient materials, replacement of door blocks with the provision of an appropriate microclimate, as well as the introduction of energy-saving technologies. The implementation of this solution will significantly reduce heat loss, reduce energy costs, increase the energy efficiency of the building and create comfortable conditions for patients and staff in accordance with modern building standards.
Project cost5'440'050 UAH
Implementation period10 months

In focus

All news