Chernivetska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
11,10 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Stream

Current set filters (Filtered result: 1)

Project code: 280126-DEC2B8A1
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date01. 2026
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Construction of a pumping station and a pressure sewer pipeline for wastewater drainage from the MSW landfill on Chornivska Street to the existing sewer collector on I. Pidkovy Street in Chernivtsi (correction)

Project goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Increasing compliance with modern standards
Geography
Chernivetska community, Chernivtsi city
Initiator
DEPARTMENT OF INFRASTRUCTURE AND WELFARE OF CHERNIVET CITY COUNCIL
Construction of a pumping station and a pressure sewer pipeline for wastewater drainage from the MSW landfill on Chornivska Street to the existing sewer collector on I. Pidkovy Street in Chernivtsi (correction)
Installation of a temporary local pumping station for wastewater drainage from the solid waste landfill on Chornivska Street to the existing drainage system of the city of Chernivtsi
The project provides for the construction of a pumping station and a pressure sewer pipeline to divert wastewater from the solid waste landfill located on Chornivska Street to the existing sewer collector on I. Pidkovy Street in Chernivtsi. The pumping station is located in an existing reservoir and provides for the installation of pumping equipment in accordance with the design solutions. The operation of the pumps is ensured in automatic mode using control cabinets, which allows for the regulation of operating modes and monitoring of operational parameters. The project provides for the installation of a pressure sewer pipeline to transport wastewater from the pumping station to the connection point to the existing sewage system. The pipeline is laid underground in accordance with the requirements of current building codes and standards. The pumping station is powered by existing networks in compliance with the requirements for reliability, electrical safety and grounding. The designed technical solutions ensure continuous and safe operation of the facility, as well as reducing the negative impact of wastewater on the environment.
Budget11'106'936 UAH
Implementation period67 months

In focus

All news