Project code: 210126-C28D2414
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date01. 2026
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Construction of a water supply network along Romodanivska, Arkhangelska, Gayova, Genicheska, Debaltsevska streets in the city of Chernivtsi (adjustment for I, II and III launch complexes)

Project goal
Meeting demand. Capacity building, Contribution to climate or environmental goals, Creation of new facilities and services, Improving the equality of wealth distribution, Improving the condition of infrastructure
Geography
Chernivetska community, Chernivtsi city
Initiator
DEPARTMENT OF INFRASTRUCTURE AND WELFARE OF CHERNIVET CITY COUNCIL
Construction of a water supply network along Romodanivska, Arkhangelska, Gayova, Genicheska, Debaltsevska streets in the city of Chernivtsi (adjustment for I, II and III launch complexes)
Preservation of decentralized water supply with local modernization of existing sources
The project envisages the creation of a centralized system of domestic, drinking and fire-fighting water supply. The source of water supply is the existing water supply network, to which the new infrastructure is connected. The project envisages the construction of an underground street water supply network with a connection to the existing centralized water supply system of the city. The network is intended for domestic, drinking and fire-fighting water supply. The total length of the designed water supply network is about 2.26 km. Modern polyethylene pressure pipes are used for construction, which ensure high reliability, durability and reduced operating costs. The project envisages the installation of water wells, shut-off valves, fire hydrants, metering and pressure regulation units, which guarantees stable and safe operation of the system.
Budget12'821'186 UAH
Implementation period40 months