The project provides for the construction of a pumping station and a pressure sewer pipeline to divert wastewater from the solid waste landfill located on Chornivska Street to the existing sewer collector on I. Pidkovy Street in Chernivtsi. The pumping station is located in an existing reservoir and provides for the installation of pumping equipment in accordance with the design solutions. The operation of the pumps is ensured in automatic mode using control cabinets, which allows for the regulation of operating modes and monitoring of operational parameters. The project provides for the installation of a pressure sewer pipeline to transport wastewater from the pumping station to the connection point to the existing sewage system. The pipeline is laid underground in accordance with the requirements of current building codes and standards. The pumping station is powered by existing networks in compliance with the requirements for reliability, electrical safety and grounding. The designed technical solutions ensure continuous and safe operation of the facility, as well as reducing the negative impact of wastewater on the environment.
Budget11'106'936 UAH
Implementation period67 months