The existing educational building of the gymnasium, where the catering unit is located, which is scheduled for major repairs - a 2-story brick building with a basement under part of the building. The building is a frame-stone structure with longitudinal and transverse load-bearing walls. It was built during the Soviet era in the late 1970s. The existing roof structure is gable. Communication between the floors of the catering unit is carried out using a staircase intended exclusively for the needs of the catering unit. The premises of the catering unit can be accessed both from an external separate entrance and from the dining room on the second floor. The area with washbasins forvisitors is located in front of the dining room.
This project provides for the arrangement of a «basic (classical)»technological scheme of the kitchen. It includes the following zones:- zone for receiving and storing raw materials;- procurement zone;- service and household zone;- main cooking zone;- zone for washing and storing kitchen utensils and equipment;- zone for issuing ready-made dishes;- dining room zone;- hand washing zone.This project also provides for the overhaul of the dining room, which is located on the 2nd floor.
The overhaul project of the catering unit is carried out in 13rooms on the first floor and in 10 rooms on the 2nd floor. These areproduction, storage and household premises, as well as a dining hall.
Work is being carried out here on the decoration of walls, ceilings, floors, replacing allexisting wooden door blocks with metal-plastic ones. On the 1st floor, a refrigerator zone is being equipped by demolishing the existing brick partition. A shower room is also being equipped on the floor, which is intended for the needs of employees of the catering unit. Previously, the shower room waslocated in the area of the existing laundry room. Masonry of a shaft for afood elevator is planned. On the 2nd floor, due to the existing distribution zone,which will be modernized by the project, the area of the dining hall and thenumber of seats are increasing. All floors are planned to be made on one levelwithout drops and thresholds.
Budget30'500'000 UAH
Implementation period11 months