Project code: 171125-BEB40521
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date11. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Modernization of the heating system infrastructure of the Storozhynetsk Lyceum of the Storozhynetsk City Council of the Chernivtsi district of the Chernivtsi region.

Project Goal
Increasing compliance with modern standards. Improving the condition of infrastructure
Geography
Storozhynets city
Initiator
EDUCATION DEPARTMENT OF STOROZHYNETSKA CITY COUNCIL, CHERNIVTSK DISTRICT, CHERNIVTSK REGION
Maturity level
81
Modernization of the heating system infrastructure of the Storozhynetsk Lyceum of the Storozhynetsk City Council of the Chernivtsi district of the Chernivtsi region.
Installation of individual autonomous heating systems in the buildings of the Supporting Institution Storozhynetsky Lyceum
The project will ensure the proper, safe and energy-efficient functioning of the Storozhynetsky Lyceum, a key institution, by modernizing the heating system infrastructure. The project is aimed at creating comfortable conditions for students and employees, reducing operating costs, increasing energy efficiency and improving the quality of the educational environment, which is necessary in the process of preparing the institution for the transition to the status of a specialized lyceum in accordance with the reform of general secondary education. The specified goal is planned to be achieved through a comprehensive modernization of the internal heating system, replacing outdated heating networks and radiators with modern energy-efficient equipment, installing automated heat supply control systems, carrying out facade insulation work, reducing building heat loss and optimizing the operation of boiler equipment. The planned measures will reduce energy consumption, equalize the temperature regime in the premises, ensure the stability of heat supply and increase the efficiency of engineering systems management.
Project cost3'000'000 UAH
Implementation period12 months