Project code: 180226-4A41C084
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date02. 2026
SectorTransport Sector
SubsectorRoad transport and road infrastructure
StatusInvestment Feasibility Study

Reconstruction using crushed stone-mastic asphalt concrete of Shevchenko Boulevard (from Lazareva St. to Nebesnoy Sotni St.), Cherkasy

Project goal
Improving the condition of infrastructure.
Geography
Cherkasy city
Initiator
DEPARTMENT OF ROAD AND TRANSPORT INFRASTRUCTURE AND ECOLOGY OF CHERKASY CITY COUNCIL
Reconstruction using crushed stone-mastic asphalt concrete of Shevchenko Boulevard (from Lazareva St. to Nebesnoy Sotni St.), Cherkasy
Reconstruction using crushed stone-mastic asphalt concrete of Shevchenko Blvd.
Shevchenko Blvd. in the section from Lazareva St. to Nebesnoy Sotni St. is classified as a main street of district significance. The total length of the project section of the street is 0.683 km. The width in red lines is 40 m. 40 m. Two-way traffic is expected along the entire length of the street, the width of the carriageway is 8.25/9 m. There are intersections with the following streets: Lazareva St., Ostafiya Dashkovycha St., Symonenka St., Smilyanska St., Nebesnoi Sotni St. Along the street on the even and odd sides there are residential buildings and commercial establishments.
Budget24'865'011 UAH
Implementation period24 months