Projects by status
1'152,45 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Initiation date
Budget
Status
State level of SP
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Purchase of a school bus for the Lisovodsky Lyceum, a Support Institution

Project Goal
Improving the equality of wealth distribution. Ensuring inclusiveness and equal opportunities, Improving the quality of services, Reducing territorial or social gaps
Geography
Lisovody village
Initiator
HORODOTS CITY COUNCIL
Purchase of a school bus for the Lisovodsky Lyceum, a Support Institution
Ordering transportation services from a private carrier
Due to the optimization of the network of secondary education institutions of the Horodotsk territorial community, planned for 2026, in particular, the closure of the Kreminyansk branch of the Lisovodsky Lyceum of the Horodotsk City Council, there is a need to ensure access to quality education and transport 49 students of the Kreminyansk branch to the closest secondary education institution to their place of residence - the Lisovodsky Lyceum.
Project cost4'000'000 UAH
Implementation period7 months
State level of SP
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Providing transportation for students in grades 10-12 to the Supporting Institution, Horodotsky Lyceum No. 4

Project Goal
Improving the equality of wealth distribution. Increasing compliance with modern standards, Ensuring inclusiveness and equal opportunities, Reducing territorial or social gaps
Geography
Horodok city
Initiator
HORODOTS CITY COUNCIL
Purchase of two school buses
Ordering transportation services from a private carrier
The project envisages the purchase of two school buses with a capacity of 32 seats each to organize the transportation of senior students to the academic lyceum and back. One bus will provide transportation along two routes. The buses will be used to ensure regular and safe transportation of senior students to the supporting (soon - academic) lyceum, which, according to the forecast, will enroll up to 900 students, more than half of whom will have to be transported from other settlements in the community.
Project cost8'000'000 UAH
Implementation period7 months
State level of SP
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Reconstruction of the building of the Horodok Primary School with the aim of arranging a catering unit at the address: 38 Shevchenko St., Horodok

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the quality of services
Geography
Horodok city
Initiator
HORODOTS CITY COUNCIL
Reconstruction of the primary school building to accommodate a catering unit
Modernization of the catering unit of the Horodotsk elementary school
The project involves a complete reconstruction of part of the school building with the redevelopment of the interior spaces for the needs of the catering unit: Dismantling work: Dismantling old partitions and decoration. Replacement of engineering networks: Updating the heating, water supply, drainage and ventilation systems. Technological arrangement: Allocation of areas for food storage, workshops for processing raw materials and a food preparation area. Fire prevention measures: Installation of warning systems, lightning protection and fire-resistant finishing of structures. Energy efficiency: Insulation of enclosing structures and installation of modern kitchen equipment.
Project cost23'900'228 UAH
Implementation period11 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

New construction of garages in the village of Kuzmin on Shevchenko Street, 3A

Project Goal
Increasing compliance with modern standards. Improving the equality of wealth distribution, Improving the condition of infrastructure, Improving the quality of services
Geography
Kuzmyn village
Initiator
HORODOTS CITY COUNCIL
New garage construction
Installation of modular metal structures (hangar type)
The construction of a one-story structure for the arrangement of garages is planned, a full complex for the functioning of the building is completed: arrangement of floors, decoration of walls and ceilings. The building is a one-story frame with dimensions in axes - 9.60x10.60 m and a height of 6.6 m. Spatial rigidity and geometric immutability of the frame are ensured by the work of frames and a system of vertical and horizontal ties. The foundations are designed as columnar on a natural basis. The paving around the canopy is concrete, 1.0 m wide. The roof is gable, sheathed with sandwich panels.
Project cost2'787'310 UAH
Implementation period6 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

New construction of a sewage network from the house for temporary residence of internally displaced persons at 17/2 Stantsiyna St., Horodok with connection to existing sewage networks at Ozerna St.

Project Goal
Meeting demand. Improving the equality of wealth distribution, Improving the condition of infrastructure, Improving the quality of services
Geography
Horodok city
Initiator
HORODOTS CITY COUNCIL
New construction of a sewage network from the house for temporary accommodation of IDPs on 17/2 Stantsiyna Street, Horodok with connection to existing sewage networks on Ozerna Street
Installation of local wastewater treatment plants (LWTP) or septic tanks
The project involves the construction of a sewer network with a connection to the existing sewer network. The construction of a sewer network with a length of 1140 m (pipe diameter - 160-200 mm), 29 sewer wells is planned. New construction with the laying of PVC pipe sewer networks is carried out using the latest technologies using rubber seals. The wells on the network are made of the IDA PLAST system and have an internal protective shell made of polyethylene for operation in highly aggressive environments.
Project cost7'027'389 UAH
Implementation period6 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusPreliminary Investment Feasibility Study

New construction of domestic sewage treatment plants on Ozerna Street, Horodok

Project Goal
Creation of new facilities and services. Improving the equality of wealth distribution, Improving the quality of services, Meeting demand
Geography
Horodotska community, Horodok city
Initiator
HORODOTS CITY COUNCIL
Maturity level
89
New construction of domestic sewage treatment plants on Ozerna Street, Horodok
Construction of sewage pumping stations, reconstruction of the sewage network and reconstruction with completion of existing treatment facilities in the city of Horodok
The project involves the construction of a treatment plant with a capacity of 500 m3/day using continuous flow technology with a complete biological treatment of household wastewater BIOPAX. Three stages of wastewater treatment are used: - first stage: mechanical treatment performed by a sand screen, after which the BOD5 indicator decreases by 10%; - second stage: biological treatment in a circulation reactor with a secondary settling tank; - third stage: biological additional treatment of wastewater in a hydroponic flowing lagoon, which returns wastewater to a natural state. The entire complex of technological facilities is located in one hall.
Project cost88'480'000 UAH
Implementation period23 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusPreliminary Investment Feasibility Study

New construction of domestic sewage treatment plants on Zavodska Ploshcha St., Horodok

Project Goal
Creation of new facilities and services. Improving the quality of services, Meeting demand
Geography
Horodotska community, Horodok city
Initiator
HORODOTS CITY COUNCIL
Maturity level
89
New construction of domestic sewage treatment plants on Zavodska Ploshcha St., Horodok
Construction of sewage pumping stations, reconstruction of the sewage network and reconstruction with completion of existing treatment facilities in the city of Horodok
Construction of treatment facilities with a capacity of 1500 m3/day using continuous flow technology with a complete biological treatment of household wastewater BIOPAX. Three stages of wastewater treatment are used: - first stage: mechanical treatment performed by a sand screen, after which the BOD5 indicator decreases by 10%; - second stage: biological treatment in a circulating reactor with a secondary settling tank; - third stage: biological additional treatment of wastewater in a hydroponic flowing lagoon, which returns wastewater to a natural state. The entire complex of technological facilities is located in one hall.
Project cost149'450'000 UAH
Implementation period23 months
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creation of an educational space for the Supporting Institution, Horodok Lyceum No. 2, Horodok

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Horodok city
Initiator
HORODOTS CITY COUNCIL
Maturity level
79
Creation of the educational space of the Supporting Institution Horodok Lyceum No. 2, Horodok, within the framework of the "New Ukrainian School" reform
Partial renovation of the material and technical base of the Supporting Institution Horodok Lyceum No. 2, Horodok, without creating a modern educational space
The project involves the creation of a modern educational space within the framework of the implementation of the "New Ukrainian School" reform in one educational institution - the flagship institution of the Horodot Lyceum No. 2 of the Horodot City Council. The project plans to create two modern science laboratories - physics and chemistry. For this purpose, the premises will be renovated and the necessary educational, laboratory and multimedia equipment will be purchased. The implementation of the project will contribute to improving the quality of science education, introducing modern teaching methods and forming practical competencies of students.
Project cost2'671'800 UAH
Implementation period11 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusPreliminary Investment Feasibility Study

New construction of a solid waste landfill on the territory of the Horodotskaya MTG

Project Goal
Creation of new facilities and services. Improving the equality of wealth distribution
Geography
Horodotska community
Initiator
HORODOTS CITY COUNCIL
Maturity level
93
New construction of a solid waste landfill
Construction of a waste incineration plant
Storage of sorted solid household waste is planned to be carried out using the method of a high-altitude MSW landfill - according to the technological scheme of leveling by the methods of "pushing" and "sliding" and intermediate insulating layers. This method of storage is the most economical.
Project cost302'500'000 UAH
Implementation period36 months
Local level of SPP
Local level of SP
Date02. 2026
SectorSocial sector
SubsectorSocial services
StatusInvestment Feasibility Study

Major repairs (insulation of facades) of a residential building for temporary accommodation of internally displaced persons

Project Goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards, Improving the condition of infrastructure, Improving the quality of services
Geography
Horodotska community, Horodok city
Initiator
HORODOTS CITY COUNCIL
Maturity level
83
Major repairs (insulation of facades) of a residential building for temporary accommodation of internally displaced persons
The building is operated without insulation.
To improve the living conditions of IDPs, implement energy saving measures, and reduce energy consumption (compliance with sanitary and hygienic requirements, elimination of existing defects), there is an urgent need to perform the following works:- roof overhang;- facade insulation;- basement insulation;- decoration and covering of pits;- installation of gutters.
Project cost8'080'370 UAH
Implementation period4 months