Horodotska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
24,90 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 240326-B80F4BED
Initiation date
Budget
Status
State level of SP
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Reconstruction of the building of the Horodok Primary School with the aim of arranging a catering unit at the address: 38 Shevchenko St., Horodok

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the quality of services
Geography
Horodok city
Initiator
HORODOTS CITY COUNCIL
Reconstruction of the primary school building to accommodate a catering unit
Modernization of the catering unit of the Horodotsk elementary school
The project involves a complete reconstruction of part of the school building with the redevelopment of the interior spaces for the needs of the catering unit: Dismantling work: Dismantling old partitions and decoration. Replacement of engineering networks: Updating the heating, water supply, drainage and ventilation systems. Technological arrangement: Allocation of areas for food storage, workshops for processing raw materials and a food preparation area. Fire prevention measures: Installation of warning systems, lightning protection and fire-resistant finishing of structures. Energy efficiency: Insulation of enclosing structures and installation of modern kitchen equipment.
Project cost23'900'228 UAH
Implementation period11 months

In focus

All news