Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 270126-5709BE7C
Initiation date
Budget
Status
Local level of SP
Date01. 2026
SectorMunicipal infrastructure and services
SubsectorDevelopment and Reconstruction of Subnational Infrastructure
StatusInvestment Feasibility Study

Reconstruction of the power supply system with the installation of a photovoltaic station with an electricity storage system on the basis of the Velikooleksandrivka Lyceum of the Velikooleksandrivka Village Council, located at the following address: Kherson region, Beryslav district, Velyka Oleksandrivka village, Bratska st.,*

Project goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards
Geography
Velyka Oleksandrivka town
Initiator
THE GREAT ALEXANDRIVO SECONDARY SCHOOL I-III GRADES #2
Reconstruction of the power supply system with the installation of a photovoltaic station with an electricity storage system on the basis of the Velikooleksandrivka Lyceum of the Velikooleksandrivka Village Council, located at the following address: Kherson region, Beryslav district, Velyka Oleksandrivka village, Bratska st.,*
Installation of a diesel generator
The goal of the project is to introduce innovative and energy-efficient solutions into the power supply system of the Veliko Oleksandrivsky Lyceum by installing a 100 kW solar power plant with an energy storage system. This will reduce the institution's dependence on unstable centralized power supply, reduce electricity costs, and create conditions for a continuous educational process. The goal is expected to be achieved by: installing a modern solar power plant with high efficiency; integrating an energy storage system to cover peak loads and emergency power; modernizing power grids and connection points; conducting educational and awareness-raising work among students and employees of the institution on the topic of energy efficiency.
Budget8'460'001 UAH
Implementation period17 months