Velykooleksandrivska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
22,46 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 171225-3BD4F887
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date01. 2026
SectorMunicipal infrastructure and services
SubsectorDevelopment and Reconstruction of Subnational Infrastructure
StatusInvestment Feasibility Study

Reconstruction of the main pressure water supply pipeline between the village of Tverdomedovo and the village of Bila Krynytsia, Velykoleksandrivska settlement territorial community, Beryslav district, Kherson region

Project goal
Improving the condition of infrastructure. Improving the quality of services
Geography
Velykooleksandrivska community, Bila Krynytsia town, Tverdomedove village
Initiator
THE GREAT ALEXANDRIVA VILLAGE COUNCIL
Reconstruction of the main pressure water supply pipeline between the village of Tverdomedovo and the village of Bila Krynytsia, Velykoleksandrivska settlement territorial community, Beryslav district, Kherson region
Current repairs and emergency restoration work on the existing main pressure water pipeline between the village of Tverdomedove and the village of Bila Krynytsia
The project provides for the reconstruction of the main pressure water supply pipeline between the village of Tverdomedove and the village of Bila Krynytsia of the Velikooleksandrivska settlement territorial community of the Beryslav district of the Kherson region. The reconstruction is being carried out due to the wear and tear of the existing water supply system and the need to replace the pipeline and shut-off valves. The technical solution provides for the laying of the main water supply pipeline from polyethylene pipes PE100 SDR11 with a diameter of 110 mm and 90 mm with a total length of 11,195 m, the arrangement of water supply wells, as well as the installation of two water towers of the Rozhnov type with a volume of 25 m³. Construction is being carried out in one turn. The design solutions are developed in compliance with the requirements for strength, reliability, durability, operational safety, ecology, energy saving, fire and technogenic safety, sanitary and epidemiological well-being of the population and accessibility for low-mobility groups. The implementation of the project ensures the restoration of the main pressure water supply and its further safe operation in accordance with current regulatory requirements.
Budget22'466'663,78 UAH
Implementation period35 months