Velykooleksandrivska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
45,27 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 130126-6E07D370
Initiation date
Budget
Status
State level of SP
Local level of SPP
Local level of SP
Date01. 2026
SectorEducation and science
SubsectorPreschool education
StatusInvestment Feasibility Study

New construction of a civil defense structure of the Malooleksandrivka comprehensive school of grades I-III, located at the address: Kherson region, Beryslav district, village of Mala Oleksandrivka, Myru st., *

Project goal
Creation of new facilities and services. Increasing compliance with modern standards, Improving the equality of wealth distribution
Geography
Mala Oleksandrivka village
Initiator
MALOOLEKSANDRIVO SECONDARY SCHOOL I-III GRADES
New construction of a civil defense structure of the Malooleksandrivka comprehensive school of grades I-III, located at the address: Kherson region, Beryslav district, village of Mala Oleksandrivka, Myru st., *
Construction of a remote self-contained shelter outside the school grounds
The alternative solution involves the new construction of a civil defense protective structure (shelter) on the territory of the Maloleksandrivska Gymnasium as a separately located facility intended for sheltering students, teaching staff and staff of the institution during emergencies of a military and technogenic nature. The proposed structure is designed as an anti-radiation shelter with autonomous operation for up to 48 hours and a calculated capacity of 265 people, ensuring the necessary conditions for the continuous educational process, medical support, sanitary and hygienic needs and the stay of persons with disabilities and low-mobility groups. The solution involves the arrangement of life support systems (ventilation, water supply, drainage, power supply, emergency lighting), engineering protection, fire safety and accessibility in accordance with the current building codes of Ukraine. At the same time, the implementation of the alternative option requires significant capital expenditures, a long design cycle, examination, and construction and installation work, and also does not allow the use of the existing premises of the institution for shelter and educational needs, which reduces the economic and time efficiency of the project implementation compared to the basic solution.
Budget45'270'550,37 UAH
Implementation period30 months

In focus

All news