Zmiivska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
Project code
Keyword
Initiator
Project/program objective
Budget
Status

Current set filters (Filtered result: 0)

Project code: 241225-DD178B3B
Initiation date
Budget
Status
State level of SP
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major repairs of the protective structure (radiation shelter) for the Municipal Institution "Chemuzhiv Lyceum" of the Zmiiv City Council, Chuhuiv District, Kharkiv Region at the address: Kharkiv Region, Chuhuiv District, Chemuzhivka Village, Kryshtalya Street, Building 1-V.

Project goal
Improving the condition of infrastructure. Ensuring inclusiveness and equal opportunities
Geography
Chemuzhivka village
Initiator
DEPARTMENT OF EDUCATION OF THE ZMEIVSKY CITY COUNCIL OF THE CHUGUIVSKY DISTRICT OF THE KHARKIV REGION
Major repairs of the protective structure (radiation shelter) for the Municipal Institution "Chemuzhiv Lyceum" of the Zmiiv City Council, Chuhuiv District, Kharkiv Region
Construction of a new radiation shelter for the Municipal Institution "Chemuzhiv Lyceum"
The shelter capacity is designed for 320 people. Overhaul of the protective structure is planned according to an individual project, which has a positive expert report. The protective structure is classified as a CC2 consequence class and a fire resistance level II, group P-4. The area of common areas (including auxiliary areas) of the shelter is 860.6 m2. The protective structure of civil defense provides for the presence of functional groups of premises (five main premises, a room for heating food; rooms for storing food; sanitary and hygienic premises, etc.), accessibility of the protective structure for low-mobility groups of the population (including a lift for MGN), replacement of engineering networks with their subsequent connection to the existing networks of the lyceum.
Budget137'598'949 UAH
Implementation period9 months

In focus

All news