Project code: 171125-BE799F20
Initiation date
Project cost
Status
Local level of SP
Date03. 2026
SectorHousing
SubsectorHousing Reconstruction
StatusInvestment Feasibility Study

Emergency restoration work (overhaul) of an apartment building at 241 Druzhby Narodiv St. in Kharkiv

Project Goal
Rebuilding the damaged/destroyed. Increasing compliance with modern standards, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Improving the quality of services, Reducing territorial or social gaps
Geography
Kharkiv city
Initiator
DEPARTMENT OF BLAGOUSTRA, CONSTRUCTION AND RECONSTRUCTION OF THE KHARKIV CITY COUNCIL
Emergency restoration work (overhaul) of an apartment building at 241 Druzhby Narodiv St. in Kharkiv
Emergency restoration works (overhaul) of an apartment building at 241 Druzhby Narodiv St. in Kharkiv with the integration of renewable energy sources
An apartment building that suffered significant damage as a result of military operations and is subject to major repairs is located at 241 Druzhby Narodiv Street (Sobornosti Ukrainy) in the Kyivskyi district of Kharkiv.As a result of the impact of the weapons, the building suffered the following damage:- destruction and significant damage to external and internal wall panels, floor slabs, partitions, balcony fences, ventilation blocks;- damage and destruction of the roll roof;- damage to the entrance group structures;- destruction and damage to floors, doors, windows and glazing of loggias;- damage to the blind area;- destruction in some apartments of internal networks and devices of heating systems, cold and hot water supply, electricity supply, sewage and gas supply.The detailed design provides for the following restoration solutions:- dismantling of the remains of destroyed structures and structures with significant damage (internal load-bearing and external non-load-bearing wall panels, floor slabs, partitions, ventilation blocks, balcony fences, window frames, doors);- dismantling of the rolled roof and covering structures on the technical floor;- installation of monolithic reinforced concrete floor slabs;- installation of monolithic reinforced concrete internal load-bearing transverse walls and side load-bearing walls of loggias;- installation of load-bearing brick walls;- installation of external fencing made of aerated concrete blocks;- reinforcement of structures;- restoration of entrance groups;- installation of new partitions on the site of the destroyed and dismantled ones; - installation of prefabricated reinforced concrete ventilation blocks;- installation of prefabricated reinforced concrete round hollow panels of the technical floor ceiling;- installation of loggia fencing;- installation of insulation: on the ceiling of the 9th floor; facades, including external window slopes and external loggia fencing; external surfaces of the walls of the machine room and under the basement ceiling;- cleaning from soot and restoring with a repair solution the surfaces of floor slabs, partitions, internal and external wall panels with minor damage;- installation of a new roll roof, insulation coating;- installation of water intake funnels;- repair and restoration of damaged elevator equipment in elevator shafts and machine rooms;- replacement of all windows with double-glazed windows in metal-plastic frames;- installation of doors;- painting of external walls with facade paints over a layer of decorative plaster;- restoration of damaged blind areas. Implementation of the project will ensure restoration of damaged housing stock, return of residents to their own homes and improvement of living conditions. The project meets the requirements of energy efficiency, social needs of the community, increases safety and comfort, contributes to the restoration of the community and meets the strategic goals of the state, and has high social significance.
Project cost70'407'872 UAH
Implementation period17 months

In focus

All news