Derhachivska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
6
Projects
Projects by sectors
6
Projects
Projects by goal
6
Projects
Projects by status
116,04 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Project cost
Status
Initiation date
Project cost
Status
Local level of SPP
Local level of SP
Date05. 2026
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Emergency restoration work (reconstruction) of the administrative building of the letter "B-1" on the territory of the KNP "Dergachiv Central Hospital" of the Dergachiv City Council of the Kharkiv region, at the address: Kharkiv region, Dergachi city, 4 1 Travnya St.

Project Goal
Creation of new facilities and services. Rebuilding the damaged/destroyed, Improving the equality of wealth distribution, Meeting demand
Geography
Derhachivska community
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "DERHACHIV CENTRAL HOSPITAL" OF DERHACHIV CITY COUNCIL
Emergency restoration work (reconstruction) of the administrative building of the letter "B-1" on the territory of the KNP "Dergachiv Central Hospital" of the Dergachiv City Council of the Kharkiv region, at the address: Kharkiv region, Dergachi city, 4 1 Travnya St.
Construction of a rehabilitation center
The purpose of the project "Emergency and restoration works (reconstruction) of the administrative building, letter "B-1" on the territory of the Dergachiv Central Hospital of the Dergachiv City Council" is to create a modern rehabilitation department on the basis of the reconstructed administrative building, which will ensure the provision of high-quality medical services in medical, physical and psychological rehabilitation for patients with various types of diseases and consequences of injuries, including military personnel and civilians injured as a result of hostilities.
Project cost41'877'649 UAH
Implementation period15 months
Design documentationAvailable
Local level of SPP
Local level of SP
Date05. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

"Energy efficiency measures - Major repairs with the introduction of alternative energy systems and thermal modernization of the educational institution "Dergachiv Lyceum No. 3" of the Dergachiv City Council at the address: 62303, Kharkiv region, Dergachi city, Sumsky Shlyakh st., 79-V"

Project Goal
Introducing innovations and energy-efficient solutions. Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the quality of services
Geography
Derhachi city
Initiator
Department of Education and Culture of Dergachiv City Council
Maturity level
90
Energy efficiency measures – Major repairs with the introduction of alternative energy systems and thermal modernization of the Dergachiv Lyceum No. 3 educational institution of the Dergachiv City Council
Phased implementation of energy efficiency measures – Major repairs with the introduction of alternative energy systems and thermal modernization of the Dergachiv Lyceum No. 3
In order to save energy, the project provides for the installation of a photovoltaic system consisting of photovoltaic modules (PEM) - 144 modules with a nominal power of 435 W each on the roof of the building, one hybrid three-phase inverter with a capacity of 50 kW and a high-voltage battery of 50 kWh, 512 V. The photovoltaic system equipment (except for photovoltaic modules) is installed in the electrical switchboard on the first floor. The photovoltaic system provides power to existing consumers in ON-Grid mode through a hybrid inverter. The use of a hybrid inverter allows for continuous power supply of some consumers in OFF-Grid mode from photovoltaic modules, from a battery or (in case of insufficient generation of the photovoltaic system and depletion of the battery charge) from the main network. The hybrid inverter charge controller provides support for the battery charge. Photovoltaic modules (a total of 144 modules) are connected in several strings for optimal power distribution. The connection of the modules in the string is carried out sequentially using a copper single-core wire of the H1Z2Z2-K 1x6 type. The photovoltaic modules are installed on the roof of the building. In order to ensure uninterrupted power supply to the shelter, the project provides for the installation of a system consisting of a Kon-TEC 10 kW inverter charger and a Kon-TEC MANA 16.0 battery - Low-voltage LiFePO4 energy storage battery of 16.07 kWh. Voltage: 51.2 V (nominal). The equipment is installed in the electrical switchboard room (shelter). All metal non-conductive parts of electrical equipment that may be under voltage must be connected to a grounding device (PE conductor). Such parts include: metal housings of electrical equipment, metal parts of ventilation equipment, metal housings of luminaires, metal pipes of communications, metal parts of the building frame, etc. The metal parts of the photovoltaic module mounting system and the cable retention system on the roof are connected to the lightning arrester grid using a round aluminum conductor d6 mm. The inverter is protected from secondary lightning strikes by designed surge arresters installed in the RSh2 DC panel on each input from the PV module.
Project cost6'876'000 UAH
Implementation period4 months
Design documentationAbsent
State level of SP
Local level of SPP
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creating a modern educational space within the framework of the "New Ukrainian School" reform

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Ensuring inclusiveness and equal opportunities, Improving the quality of services
Geography
Derhachi city
Initiator
Department of Education and Culture of Dergachiv City Council
Maturity level
90
Creating a modern educational space within the framework of the "New Ukrainian School" reform
Partial modernization of the educational space within the framework of the "New Ukrainian School" reform
Creating a modern educational space in an educational institution within the framework of the implementation of the "New Ukrainian School" reform involves a comprehensive update of the material and technical base and the introduction of modern approaches to the organization of the educational process. Within the framework of the project, classrooms are equipped with modern educational, laboratory and multimedia equipment, educational materials are updated, and conditions are created for the use of digital technologies in teaching. This allows for interactivity, practical orientation and competence-based nature of the educational process.
Project cost9'068'562 UAH
Implementation period6 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date04. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Reconstruction of the water pumping station complex in the city of Dergachi

Project Goal
Improving the equality of wealth distribution. Increasing compliance with modern standards, Improving the quality of services
Geography
Derhachi city
Initiator
MUNICIPAL ENTERPRISE "DERHACHIKOMUNSERVICE" OF DERHACHI CITY COUNCIL
Maturity level
85
Reconstruction of a complex of buildings (water pumping station "B", water pumping station "B1", shed "B") in the city of Dergachi
Partial modernization of the VNS without implementing a full-fledged water treatment system (replacement of pumping equipment and minimal repair work)
The project provides for the reconstruction of the complex of water pumping station facilities (WPS), with the installation of a water treatment plant to bring the quality of artesian water from the existing well and reserve well to the regulatory indicators according to DSan PIN 2.2.4-171-10 (Hygienic requirements for drinking water intended for human consumption).
Project cost30'786'470 UAH
Implementation period10 months
Design documentationAbsent
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creation of an educational space within the framework of the "New Ukrainian School" reform in the Dergachiv territorial community

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Derhachi city
Initiator
DERGACHIV CITY COUNCIL
Creation and arrangement of a center to ensure teaching of the academic subject "Defense of Ukraine" in the Dergachiv territorial community
Partial arrangement of a classroom for teaching the subject "Defense of Ukraine" in the Dergachiv territorial community
Creation and arrangement of a center to ensure teaching of the academic subject "Defense of Ukraine" at the Municipal Institution "Dergachiv Lyceum No. 2" of the Dergachiv City Council
Project cost3'894'834 UAH
Implementation period4 months
Design documentationAbsent
State level of SP
Local level of SPP
Local level of SP
Date02. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major renovation of the catering unit of the dining room of the Dergachi Lyceum No. 3, Dergachi City Council, at address: Sumsky Shlyakh Street, 79-V, Dergachi city, Kharkiv district, Kharkiv region

Project Goal
Improving the quality of services. Increasing compliance with modern standards
Geography
Derhachi city
Initiator
DERGACHIV CITY COUNCIL
Maturity level
88
Major renovation of the catering unit of the canteen of the Dergachi Lyceum No. 3, Dergachi City Council, at the address: Sumsky Shlyakh Street, 79-V, Dergachi city, Kharkiv district, Kharkiv region
Organization of food delivery for education seekers
A comprehensive modernization of the premises of the catering unit of the Dergachiv Lyceum No. 3 of the Dergachiv City Council is proposed using the technological model of the basic kitchen. The work involves updating the walls, floor and ceiling, upgrading the water supply, sewage, electricity and ventilation, installing modern kitchen equipment and zoning work processes to increase efficiency, safety and sanitary standards. The result will be a modern, energy-efficient and functional catering unit, ready for daily use.
Project cost23'541'364 UAH
Implementation period9 months
Design documentationAvailable

In focus

All news